material review : action items
- Modify the code according Jason’s comments
- Pixlgeo4.xml and Pxstgeo1.xml should be in the same directory
- Check the material with proper definition : make sure to pick the correct material, not AIR
- Many “blueprints” in the code ---> better to use a <Struc… > block
- There are many instances of a single material ,better to define a mixture
- BFC chain : timing test on the reconstruction, not only the .fz generation : the current drupal blog is here
- Implementation of additional material for the PST :
- shrouds,
- West End stabilizing bull horn (Plastic),
- trapezoid shape holding the rings
- BFC chain : there is an existing option for the pileup
Actions items (from Spiros)
Finish geometry
- put appropriate mass in PST/PIT/rails etc
- code sector holder, sector terminator, shrouds etc, things we know
- Cu, low mass (transition signal cables)
- Mass termination boards MTBs (z=~96cm)
- Heavy signal cables (up/down only) after the MTBs
- ??? (Other, TBD)
- Beam pipe needs to be finalized. Have a draft drawing in hand.
- HFT support cones are attached to TPC wheel (like SVT)?
- - Impacts geometry/alignment work. Answer is ‘yes’
- Use official pile-up mechanism, study UPC in detail (with Geant for spirals), ask PHENIX about background
- Use VMC for (mis-) alignment MC studies?
- Code needs to be segmented so that ladder/sector etc geometry corrections can be applied in GEANT too.
- A lot of other code clean-up comments from Jason (separate doc)