Sort by:[Date]

FPS TUFF CCA JUL 23 2014

 
 This is nearing the final design for TUFF control box and power distribution to FPS FEE's
 
 

FPS TUFF CCA JUL 23 2014

 
 This is nearing the final design for TUFF control box and power distribution to FPS FEE's
 
 

Testing stiscan with geant steps tree

The following images show energy deposited in some Sti volumes for what supposed to be a similar set of tracks, i.e. track generated at z=-3 cm perpendicular to the beam.

SSD Sti Geometry

SST Sti Geometry

Updated SST Sti geometry

/star/institutions/ksu/bouchet/S

HFT Pixel Survey report July17

Sti Volume Segmentation Test

Without volume segmentation With volume segmentation
 </div>
    <div class=»

FMSPS: Voltage scans for SiPM radiation damage test

Radiation damage test

I(V) curves: www.star.bnl.gov/~dham/fmsps/iv.png

HFT + S&C Meeting, July 3, 2014

PXL: -30 cm < z < +30 cm

S&C Meeting, June 25, 2014

The Goal

  • Verify implement

Static TPC distortion/alignment study