Sort by:[Date]

TOF OPS: How to collect the VPD HV scan data

 Note: there should be two GUIs seen on the VPD monitor (slow controls station) in the control room.

TOF OPS: How to set up three default VPD HV sets for a gain calibration

ssh sysuser@sc5.starp.bnl.gov

cd llope/VPD

EEMC Calibrations Questions

My understanding about how the EEMC calibrations work (mostly from Alice Bridgeman):

 

Public talk

After giving public talks for RHIC as part of the BNL Speakers Bureau from 2000-2006, I accumulated a lot of material into the talks.

Gain curves from 01/26 LED data

Following are the gain curves from LED runs that we took on Jan.26th.

EEMC Calibration Code Error

11/29/10

The following is output to the screen when I try to run the calibration code for sector 1 and plane U in iteration 3:

Preliminary Steps

Log onto BNL shell:

    ssh rssh.rhic.bnl.gov

Log onto server:

    rterm -i

    (enter password at prompt)

How to change the default language on all PowerPoint slides

Here is the case - you receive a presentation from someone else and find out that the default language for all text box is a foreign language while the context is English.

Elimination of spam with empty subject Email

There is a class of Email Spam coming with empty subject (sometime no To: fields) and generally, those are not flagged by spamfilters as such (bummer!

A load balancing study (stream test)