Sort by:[Date]

BTOW timing runs 10065031-45

Introduction

 

The following runs were taken for BTOW timing:

QM09 Presentation

Hi All,

You can find my QM 2009 talk attached. Feedback is sought after.

Thanks,

Bertrand

 

 

Analyzing runs 10066001-114

Introduction

Runs analyzed:

Run 9 Calibr & QA

There are several things collected w/ this entry:

**********************************************************

I. 1st DRAFT OF BPRS HV SETTINGS

Cut Variable and Kinematics Distributions

 Plots and description are in the attached .pdf file (warning: large file).

 

Run9 BTOW HV Mapping Analysis - Part 1

It has been seen that a number of towers are not where we think the are in the HV system (probably a bunch of cables are switched).

The BBC beam background scalers saga

 While studying scalers for SpaceCharge calibration of Run 8 data last summer, I found that the BBC beam background scalers were clearly You do not have access to view this node (regarding which one

Opened simulation requests 20090304

 

Table summary - simulations in priority order.

toward BTOW HV mapping

 The following runs were taken on March 3rd, runs 10062047-61

 Table 1.

Some BSMD spectra

Figure 1: BSMD eta plane spectra for 8 crates, run 10060041