Sort by:[Date]

Run 12 EEMC Tower Gain Evolution

 

HF PWG Meeting Minutes by Zhenyu - 2015/04/09

Nikolai Smirnov, TPC Grid leak, 2005

 

Detail investigation of TPC dEdx distribution

 

An additional A_LL systematic?

Beam Positioning Check on day 097 (April 7)

There was an indication that the beam position was moved on Monday (day 096, April 6) morning around 10am. We looked at the runs taken in the store Monday night through Tuesday morning.

Run 9 Simulation Fudge Factors Investigation

A new look at the weights and fudge factors for the Run 9 simulation ...

APS-GHP 2015 talk draft

 

run13 pp500 gain calibration -- electron

 

Away-side jet correlations paper proposal