Sort by:[Date]

HP PWG Update Tamis 5/9/24

 

TPC Gating Grid Transparency study

The first test was conducted on 2024-05-03 at approximately 11:30-11:45am EDT (BNL time), runs 25124020-25124026.

preliminary request

 

Xi global polarization in AuAu 7p7-17p3GeV BES-II

 

Paper Proposal: Energy dependence of triangular flow

pileup estimation

 

CPOD 2024 Presentation

 

PH splitting check in isobar

 

Run 24 pp and AuAu EMC timing

Run 24 pp timing:

1) Initial timing scans were done on run #25118040 from 27 April 2024:

Very low pT jpsi paper proposal (update)