HFT Sub-system Integration
Integration sub -system.
reports, links to pictures
Installation
- Assembly Notes for the Fall 2012 Assembly of the HFT Carbon Fiber Support structure, including the new beam pipe. Bill Christie & Bob Soja word document
- IDS assembly document for Fall 2012 word document
Mechanical for IDS
Electrostatics for IDS
- Results of electrostatics tests at UIC Gerard Visser word document 2011
- Effect of ledge and aluminized mylar for WSC Howard Wieman Fall 2011 powerpoint
- Summary of Electrostatic Field Calculations for WSC Design DickMajka 19 August 2010 word document
Beam Pipe
- Beam pipe design considerations D.Beavis, J.Brodowski, J.Scheblein, E.Andersen, 2009 file
- Beam pipe effective radiation length design D.Beavis 2009 file
Pictures
- September 2012 Assembled and ready to install IDS by BNL photography LINK