First version: 08/27 3AM
https://drupal.star.bnl.gov/STAR/system/files/Detector_Configuration_Components_v0.pdf
i) current detector layout
ii) additional detector components by ~2020 (before RHIC completion) iTPC, FCS and RP II
iii) proposed detector upgrades for eSTAR ETOF, ETRD, BSO (CEMC)
iv) known performances and detector resolutions, and how they meet the EIC requirement
possibly two tables (one on detector list and eta coverage, capabilities
second table on specific electron, hadron PID coverages to be used in other sections
v)possible options and improvements other than the baseline eSTAR components
a) mainly item is the inner tracker (HFT') b)trigger components etc...
vi) IR design and impacts on detector and luminosity for eSTAR