Calibration Schedules
The listed dates should be considered deadlines for production readiness. Known issues with any of the calibrations by the deadline should be well-documented by the subsystems.
- Run 15: projected STAR physics operations end date of
2015-06-19 (CAD) 2015-06-22
- pp200
- tracking: 2015-07-22
- all: 2015-08-22
- pAu200
- tracking: 2015-08-22
- all: 2015-09-05
- pAl200
- tracking: 2015-09-22
- all: 2015-10-06