STAR Collaboration:
decadal plan,
eSTAR Letter of Intent,
Beam Energy Scan Whitepaper,
A Polarized p+p and p+A program in the coming years
eRHIC CDR
http://arxiv.org/ftp/arxiv/papers/1409/1409.1633.pdf
*********
2015 Long Range Plan:
The charge letter can be found at the URL:
http://science.energy.gov/~/media/np/nsac/pdf/20140424/NSAC_LRP_Charge_04242014_Hallman.pdf
Hot QCD Town Meeting Summary:
https://drupal.star.bnl.gov/STAR/system/files/HotQCD_TM_Summary_final.pdf
Town Meetings:
3. QCD:Hadron + Heavy Ion to meet together
QCD Heavy Ion Conveners: Paul Sorensen (Brookhaven National Laboratory) and Ulrich Heinz (Ohio State University)
QCD Hadron Conveners: Haiyan Gao (Duke University) and Craig Roberts (Argonne National Laboratory)
Meetings of interest:
EIC Users group meeting at Stonybrook, June 27-29, 2014
Users meeting of JLAB: at JLAB on June 1,2, 2014
Users meeting of RHIC: at BNL on June 17-20, 2014
High Performance Computing (Computation in Nuclear Physics), Washington DC, July 14-15, 2014
<<<<
Past and current upgrade proposals (2005 - 2010) are given in the proposal page (updated Feb 14, 2010)
STAR Upgrade Workshop at BNL (June 11-12, 2012)
STAR R&D and upgrades for 2012
The page contains the documents for proposal, new, those upgrades in progress and the past proposal for upgrades that has been implemented. Review committees for the new proposals (Fall 2009) has been established. The charge and process for assessing and prioritizing these are given in the attached file.
Ongoing upgrades
eSTAR LoI and details at its bookpage
an Upgrade to the Inner Sectors of STAR Time Projection Chamber
HFT+ (an upgrade to HFT in 2020)
Forward Upgrade (Forward Calorimeter System and Forward Tracking System)
Heavy Flavor tracker
Heavy Flavor Tracker - June 8, 2006
Heavy Flavor Tracker - October 10, 2007
HFT CD-0 Review Report
January 9, 2009: Letter to BNL; Report: Final version; Excerpts
Future material will be posted on the child page HFT project
Forward GEM Tracker- December 29, 2007(MIT link) local link
Quarterly report Q1Fy11
New Proposals
High Level Trigger (HLT)
LOI 2009 -- committee report (4/6/2009)
Final report from on proposal, February 2010
Muon Telescope Detector (MTD)
Proposal October 2009
Report from Commitee received Jan 21, 2010
Revised Proposal February 10, 2010 submitted to BNL management.
A BNL lead review with DOE participation was held on September 17 2010. The talks are available at http://www.star.bnl.gov/~ruanlj/MTDreview2010/mtd.htm . The final report from the commitee was received October 23 2010.
Forward Hadron Calorimeter (FHC)
HCAL East Proposal (July 28 2016)
HCAL_proposal_140510.pdf (May 19, 2014)
Forward Hadronic Calorimeter- November 15, 2008
Forward Hadron Calorimeter revised proposal- October, 2009
The document above is a combined, memo, old proposal, review report and upgrade to the original proposal including comments to review report question.
Report from the review committee received December 03, 2009
Phase II of physics with tagged forward protons
Glueball Search and Diffractive Physics with the STAR Detector at RHIC - proposal, November 2009
Final Report February 2010
Revised proposal submitted to BNL August 5, 2010
upgrades that have now been completed. Kept for historical reference.
Time of Flight - May 24, 2004
Forward Meson Spectrometer - Jan., 13, 2005
DAQ 1000 - March 22, 2005
Tagged Forward Protons - July 12, 2005
Projectl documents for the HFT upgrade project.
Documents related to the CD-0, CD-1 reviews and subsequent actions can be found (temporarely) here. Information on internal reviews, monthly reports are available in child pages. (Note the second Internal review is dummy- at end of list)
The HFT received CD-4 approval on September 25, 2014.
An OPA min-review was held on September 24 as a video/phone conference
The review took place at BNL on Feb 15. The talks are given below, including the commitee report
Management information for HFT.
There are several project specific mailing lists. Pertinent information on these can be found in this document
HFT management has roughly every 2-3 months face-to-face or phone conference meeting dealing with project status, and detailled sub-system reports.
The meeting content is usually placed on the STAR event drupal page. The list below includes the most recent, but not all historical links.
2014
June 10, 2014: Face-2-face meeting at LBNL to prepare for the CD-4 Closeout review
Link to meeting agenda and talks.
2013
September 10 at LBNL during STAR collaborations meeting.
Star HFT focus meeting. Link to agenda and talks
July 10, HFT software workshop
link to agenda and talks
2012
Tuesday December 3, Phone/EVO link to agenda and talks
Tuesday September 25, LBNL link to agenda and talks
Monday June 18, UIC link to agenda and talks
Friday May 25, BNL link to agenda and talks
Wednesday March 14, LBNL link to Agenda and talks
Tuesday January 10, LBNL/BNL link to agenda and talks
2011
Monday November 14, LBNL link to Agenda and talks
Project Documents
Documentation page for SSD
The older doumentation page is available at this link . Much of the information is still relevant.
2013
Installation
DOE/SC Review of the STAR HFT Project July 7-18
Presentations:
Project Overview .......................F.Videbæk
Schedule and Budget .................. S.Morgan
Global Structure and Engineering E.Anderssen
PXL sub-system .......................... L.Greiner
IST subsystem ............................. G vanNieuwenhuizen
SSD sub system ........................... J.Thomas
Integration and Assembly ............ R.Sharma
Software ...................................... S.Margetis
|
11:00 am HFT Executive Session....................................................................................... L. Nelson
11:30 am Project Overview.................................................................................... F. Videbæk
12:00 am Project Cost and Schedule—Q&A…………………………………… S. Morgan
12:30 pm PXL Status/Requirements—Q&A............................................................ L. Greiner
13:00 pm IST Status/Requirements—Q&A...................................................................... Z.Ye
1:30 pm SSD Status/Requirements—Q&A ........................................................... J. Thomas
2:00 pm Break
2:30 pm Lessons Learned, Transition to Operations , Contingency Spending Q&A F. Videbæk
3:15 pm Project Summary and Recommendation................................................... .L. Nelson
3:45 pm Executive Session
4:30 pm Closeout and Adjourn
Documents that are refered to in the requirements document
One recommendation of the July OPA review was to conduct a mini-review in October, in particular to assess progress on SSD, but also to review progress on the few other recommendations.
The charge for the review was:
1. What is the status of the Silicon Strip Detector (SSD)? Is management making progress towards addressing the technical issues of the SSD, and mitigating corresponding cost and schedule impacts?
2. Have there been any significant changes or risks affecting cost, schedule, and scope since the prior DOE/SC review? If so, is appropriate management action being taken?
3. Is the project addressing appropriately the recommendation(s) from the prior DOE/SC review(s)?
The review included 3 talks
- Overview F.Videbæk
- SSD Status J.Thomas
- Cost and schedule S.Morgan
The closeout had in essence the following recommendations:
Submit BCR-4 to the NP Program Manager for review by November 1, 2012.
Following CD$ there has been a few follow-up reports. These reside on this page
The PXL group has created a report on the damage and repair plan for the PXL#2 detector. See word document
The project was also asked to update the transsition to ops document describing how to get to the optimum value.
This is attached below.
Quarterly meetings with DOE in FY15 to discuss progress
At the November 12 meeting DOE acccepted that the UPP has been met, congratulated the efforts, and declared no further meetings are
required.
HFT project internal reviews . This page mainly have links to other pages:
2013
2012
2011
2010
Upgrade to HFT in 2020 workshops and materials: https://drupal.star.bnl.gov/STAR/conference/timetable/talk/32215 https://drupal.star.bnl.gov/STAR/meetings/hft-upgrade-discussion-meeting/hft-upgrade-discussion
Call for STAR R&D requests for FY09, September 15, 2008
GMT Review Committee, September 12, 2008
HFT CD0 review, February. 25-26, 2008
FGT review, MIT, Jan. 7-8, 2008
Physics in the DAQ1000 Era, BNL, Aug. 16-17, 2007 - Drupal Page with Links to Presentations
Upgrades Workshop, BNL, Dec. 1-2, 2005
Tracking Upgrade Workshop, LBNL, Nov., 5,6, 2004
2004 Near Term Upgrades Workshop, Yale, June 15-17, 2004
Tracking Upgrade Meeting, MIT, Nov., 7,8, 2003
STAR Tracking Upgrade Working Group
.
Simulation Issues, 22-Sep-2003
D0 RAA
.
SSD Readout Upgrade (Nov. 5, 2007)
Photon Converter Proposal (Nov. 12, 2007)
Event Plane Detector (Dec. 5, 2007)
R&D on a novel and compact Muon Telescope Detector for QCDLab (MTD)
T963 FermiLab Meson Beam Test For FGT and MTD (May, 2007) ;Test beam Results and Discussions
GEM Monitor for TPC (GMT) (October 15, 2007)
Forward calorimeter R&D
R&D proposal for EIC:
https://drupal.star.bnl.gov/STAR/system/files/OTsai_onepage.pdf
https://drupal.star.bnl.gov/STAR/system/files/OTsai_supportingdoc.pdf
Three upgrades are being prepared for run-15. namely a peshower, refurbishing of FMS, and the RP-II*
In addition STAR made a call for R&D with deadline on December 15.
Three upgrades are being prepared for run-15. namely a peshower, refurbishing of FMS, and the RP-II*
In addition STAR made a call for R&D with deadline on December 15. The documents received are:
The talks at the February 10, review can be found athttps://drupal.star.bnl.gov/STAR/event/2014/02/10/star-rd-2014-and-itpc-review
on the STAR event page.
eSTAR LoI v31 a few clean-up, 10/05/2013
eSTAR LoI v30 with improved figure quality compared to v28, 09/30/2013
v28, for submission 09/29/2013
v23, implement comments from Collaboration, ALD and PHENIX, 09/26/2013
v17, to the collaboration, 09/16/2013
zip file for all figures used in eSTAR LoI 09/24/2013
v14 to the eSTAR LoI committee -- 09/15/2013
Executive summary - initial draft dated 09/13/2013
Latest verion in 09/09/2013, eSTAR-LoI_v9 - comments sought and welcome, preferrably by 09/12/2013
Second draft dated: 08/26/2013 9AM
https://drupal.star.bnl.gov/STAR/system/files/eSTAR-LoI_draft_v1.pdf
First draft dated: 08/25/2013 9PM
https://drupal.star.bnl.gov/STAR/system/files/eSTAR-LoI_draft_v0.pdf
high resolution version:
eSTAR Letter of Intent:
Draft: https://drupal.star.bnl.gov/STAR/node/27990
Presentation to STAR council
eSTAR LoI Charges from ALD/BNL:
http://drupal.star.bnl.gov/STAR/system/files/Charge%20to%20PHENIX%20and%20STAR%20Collaborations_v3_8May2013.docx
eSTAR LoI Charges from STAR Collaboration:
http://drupal.star.bnl.gov/STAR/system/files/eSTAR_LOI_Charge_May2013.doc
eRHIC Design Study Document for LRP:
outline of eRHIC Design Study Document for LRP 2014
eSTAR Task Force:
Charges:
In order to prepare the experiment to complement the ongoing physics programs
related to AA, pA and pp collisions with a strong ep and eA program by an
additional electron beam and prepare the collaboration to participate in the US
Nuclear Physics Long Range Planning exercises during 2012-2013, we establish
the eSTAR Task Force.
This task force will be in function during the next three years. The main charges
for the task force are:
(1) Identify important physics measurements and assess their science impact during
the eSTAR era (2017-2020). Prepare a white paper or an updated decadal plan
including physics sensitivities and detailed R&D projects.
(2) With (1) in mind as well as the eRHIC interaction region design(s) and other
constraints, identify and advise STAR Management on priorities for detector R&D
projects within the collaboration.
(3) Engage the collaboration by organizing special ep/eA workshops, document the
progress and report annually to the collaboration.
(4) Work with the STAR management and the EIC task force (setup by the BNL
management) to strengthen the physics case(s) for eSTAR and a future EIC.
Detector R&D:
Forward Spaghetti Calorimeter (FSC)(April, 2011)
Forward TOF/TRD (ETTIE) (November, 2011)
BBC Polarimetry (ANL) (November 2011)
Crystal BSO Calorimeter (USTC)(November 2011)
TPC Endcap Material pictures vs gSTAR
All EIC R&D Proposals (November, 2011)
EIC R&D Committee Report (12/23/2011)
Wiki and mailing lists:
eRHIC Sciences and Configurations
INT Workshop Report on EIC science case
mailing list: estar-hn@www.star.bnl.gov
Biweekly EVO phone meeting:
eSTAR LoI Meeting since 07/29/2013
Monday 1-2PM (SeeVogh# 15 9119)
New meeting since 01/31/2012
Tuesday 12--1PM;
EVO 12 3569
Last Meeting was 01/18/2012:
Wednesday 12:30--1:30PM;
EVO ID 109811;
PLEASE check hypernews and drupal events for updates