Upgrades

Forward Physics Workshop in Heavy Ion Collisions on Sep 10, 2015

Under:

location: Conference Room 2-219, BLDG 510, BNL; time: 9:00 am to  6 pm on Sep 10, 2015
talks are here:
https://drupal.star.bnl.gov/STAR/conference/timetable/talk/34440 .

FTS+FCS meeting on 08/31/2015

Under:

 1) news from Berkeley meeting:

action items: short document to ALD in Sep.
full proposal ready in Oct.
 
2)

FTS+FCS meeting on 08/17/2015

Under:

1) one page update for pp, pA case: elke et al.
2) one page update for AA case: jiangyong et al.

FTS+FCS meeting on 08/10/2015

Under:

1) one page for pp, pA case: elke et al.
https://www.dropbox.com/s/xu1piuii060pro4/pp.pA.OnePager.docx?dl=3D0

2) one page for AA case: jiangyong et al. 

FTS+FCS meeting on 07/20/2015

Under:

 1) zhangbu's presentation on uique physics topics with forward upgrades

FTS+FCS meeting on 08/03/2015

Under:

 1) one page write up for heavy ion part: jiangyong et al.
https://www.dropbox.com/s/kf254pe5uj6kdeb/onepagev3.pdf?dl=0 

FTS+FCS weekly meeting 07/27/2015

Under:

 1) jiangyong's presentation on heavy ion physics

2) elke's plot on x-Q2 for star pA drell-Yan measurements together with world wide data

FTS+FCS weekly meeting

Under:

 

Detector Configuration, cost and schedule

Under:

FCS proposal cost and technical driven schedule. https://drupal.star.bnl.gov/STAR/system/files/FCS_proposal_v2.docx

Heavy-Ion Physics Cases for Forward Upgrades

Under:

Latest version (combine simulations from LBL/SINAP, text from Purdue and SBU)

HFT+

Under:

Upgrade to HFT in 2020 workshops and materials: https://drupal.star.bnl.gov/STAR/conference/timetable/talk/32215 https://drupal.star.bnl.gov/STAR/meetings/hft-upgrade-discussion-meeting/hft-upgrade

STAR RD and upgrades for 2014

 Three upgrades are being prepared for run-15. namely a peshower, refurbishing of FMS, and the RP-II*

STAR RD and upgrades for 2014

 Three upgrades are being prepared for run-15. namely a peshower, refurbishing of FMS, and the RP-II*

In addition STAR made a call for R&D with deadline on December 15.

Electronics

New Electronics

iTPC

an Upgrade to Inner Sectors of STAR Time Projection Chamber

Dihadron Correlation at 10X100 Q2=1 y=0.7 with STAR tracking smearing

Under:

 

version 1.0

Under:

eSTAR LoI Draft

Under:

eSTAR LoI v31 a few clean-up, 10/05/2013

2012 R&D and Upgrades

Under:

 STAR called for R&D for FY13 in early September. The proposals received are given here.

eSTAR Task Force

Under:

eSTAR Letter of Intent:
Draft: https://drupal.star.bnl.gov/STAR/node/27990