Events
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr here
Discussion Points
- Final close-out of iTPC;
QA experts:
- BBC - Akio Ogawa
Group meeting this week.
agenda
1) run status
2) PAC summary
3) QM submission
4)collaboration meeting agenda and plan
1) first look on strangeness in AuAu 54 GeV--- Xianglei
- Status and projections of collider run at 7.7 GeV
- Strategy for remaining weeks of the run
Agenda:
======
this meeting will focus on software updates both from tracking and calorimetry
To join the Meeting:
BES Analysis Efforts
DNP Abstracts
Calibrations/QA/Production
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr here
Meeting Location - BNL Room 1-189
QA experts:
- BBC - Akio Ogawa
- Status and projections of collider run at 7.7 GeV
- Planning for the switch to 4.59 GeV (Wednesday?)
- Collisions at 9.2 GeV
See agenda at:
https://drupal.star.bnl.gov/STAR/pwg/spin/meetings-list
Agenda:
=====
- presentation by Daniel on tracking (see slides from last week)
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr here
Meeting Location - BNL Room 1-189
Proposed abstracts:
https://drupal.star.bnl.gov/STAR/blog/yezhenyu/quark-matter-2019-abstracts
QA experts:
- BBC - Akio Ogawa
1) QM2019 abstracts
https://drupal.star.bnl.gov/STAR/blog/yezhenyu/quark-matter-2019-abstracts
Updates on
- QM abstracts
- Collaboration meeting
- Isobar production
AOB
- 4.59 GeV Running (now until July 8th)
QA experts:
- BBC - Akio Ogawa
Preliminary plots -- Bill Schmidke
Meeting BlueJeans connection in BlueJeans App:
https://bluejeans.com/8724377961/4641
in a browser:
Agenda:
- FXT at 31.2 GeV
- Collisions at 200 GeV
See agenda at:
https://drupal.star.bnl.gov/STAR/pwg/spin/meetings-list
===Agenda ===
- Discussion about 200 GeV data taking preparations
- Updates on all systems
- Updates on costing of equipment
To join the Meeting:
FXT 2019 : 4.59 GeV [Fast Reconstruction]
QA experts:
- BBC - Akio Ogawa
Agenda:
1. run 19 progress and end plan
RHIC retreat
2. DOE S&T review in September