Yields - Inv Mass

Trigger Analysis Day 129

 Some conclusions based on the attached PDF file.

HF PWG Meeting Minutes by Zhenyu - 2015/05/07

1) MTD Data production - Lijuan

sst software for production 14

Speaker : jonathan


Talk time : 12:00, Duration : 00:20
summary of SSD meeting : http

Run XII CuAu200 dE/dx Calibration

dE/dx calibration for Run XII CuAu200 has been done and uploaded in MySQL.      

 

Hot towers in the small cells

Here is a lego plot of a possible problem in the small cells. 
r16129022 is at the beginning of a store and r16129039
is at the end of a store.

Run15 pAu 200GeV TOF3*VPDMB-5 vs TOF3*VPDMB-30 trigger

Motivation:

run 15 p+Au 200GeV

Production: fastoffline
 
TOF3: tofmult>100

Small BS2 snapshot

 I made event displays for the first 1000 triggers of run 16129022. See attached file.

PWGC Meeting

2015-05-12 11:00
2015-05-12 12:30
America/New York

 --- Agenda ---

dsmAdc issue from the trigger simulator

Dataset: p+p 500 GeV, 2011, BHT1 trigger (id: 320501, dsmAdc > 18)
Library: SL11d

200 GeV paper

CIPANP 2015 slides

 

pAu progress


Talk time : 12:30, Duration : 00:20

 

APEX fixed target test run

Speaker : Dan Cebra


Talk time : 12:50, Duration : 00:20

 

Trigger Board Meeting for Run15

2015-05-18 12:30
America/New York
Monday, 18 May 2015
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 16:30 (GMT), duration : 00:00
 
TimeTalkPresenter
12:30pAu progress ( 00:20 ) 1 file
12:50APEX fixed target test run ( 00:20 ) 1 fileDan Cebra

Plots and Figs from pAu

Speaker : Bill


Talk time : 12:50, Duration : 00:20

 

p-Au AN Day 126-128

 See attached file.

pAu rates vs projections


Talk time : 12:30, Duration : 00:20

 

software news


Talk time : 17:30, Duration : 00:20

 

Trigger Board Meeting for Run15

2015-05-11 12:30
America/New York
Monday, 11 May 2015
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 16:30 (GMT), duration : 00:00
 
TimeTalkPresenter
12:30pAu rates vs projections ( 00:20 ) 1 file
12:50Plots and Figs from pAu ( 00:20 ) 1 fileBill