Subsystem usage/modification/implementatiion

Speaker : AQ+Subsystems


Talk time : 16:20, Duration : 00:20

 

QA tests/issues to address

Speaker : AQ+Embedd. coordinator


Talk time : 16:00, Duration : 00:20

 

Maker structure/calls/examples

Speaker : AQ


Talk time : 15:40, Duration : 00:20

 

Method Outline

Speaker : AQ


Talk time : 15:20, Duration : 00:20

 

Brief Overview [Problem, Issues]

Speaker : MM


Talk time : 15:00, Duration : 00:20

 

Roundtable

BREAK

RUN15 - Calibration needs/timeline

 

Speaker : JB


Talk time : 14:30, Duration : 00:30

RUN15 - New DAQ/other features

 

Speaker : LZ


Talk time : 14:00, Duration : 00:30

LUNCH

Roundtable on Timelines and Goals

JB : tentative timeline according move SSD-->SST code + calibration readiness --> here


Talk time : 11:35, Duration : 00:55

Production2014 - Chain readiness Part-3 [geometry - any remaining issues]

Production2014 - Chain readiness Part-2

 

Speaker : JB


Talk time : 10:45, Duration : 00:30

BREAK

Production2014 - Chain readiness Part-1

 

Speaker : LZ


Talk time : 10:00, Duration : 00:30

SSD to SST

 

Speaker : JB


Talk time : 09:30, Duration : 00:30

Overview [Progress since last Workshop]

 

Speaker : JB/JT


Talk time : 09:00, Duration : 00:30

SSD Software Workshop

TimeTalkPresenter
09:00Overview [Progress since last Workshop] ( 00:30 ) 4 filesJB/JT
09:30SSD to SST ( 00:30 ) 2 filesJB
10:00Production2014 - Chain readiness Part-1 ( 00:30 ) 2 filesLZ
10:30BREAK ( 00:15 ) 0 files
10:45Production2014 - Chain readiness Part-2 ( 00:30 ) 2 filesJB
11:15Production2014 - Chain readiness Part-3 [geometry - any remaining issues] ( 00:20 ) 0 files
11:35Roundtable on Timelines and Goals ( 00:55 ) 2 files
12:30LUNCH ( 01:30 ) 0 files
14:00RUN15 - New DAQ/other features ( 00:30 ) 2 filesLZ
14:30RUN15 - Calibration needs/timeline ( 00:30 ) 0 filesJB
15:30BREAK ( 00:30 ) 0 files
16:00Roundtable ( 02:30 ) 0 files

Upsilons in U+U - E/p corrections revised

Pythia W events embedded in Run13 p+p 500 GeV zero-bias (for KFParticle vertex finder)

Request TypeSimulated background embedding (generator with real data as background for noise / pile-up studies)
Description 
Embed Full PYTHIA MC W events into Run13 pp 500 GeV zerobias (ZB) data events with full ADC information and do complete
track, vertex, etc. reconstruction.
Trgsetupname: 
pp500_production_2013
Library: SL14a
Run numbers: 
14109030, 14076086, 14090042, 14124026, 14108059, 14116042
Full reconstruction chain will be used with modification for KFParticle vertex finder.

General Information
Request ID20151601
Priority: EC0
Priority: pwgNormal
StatusNew
Physics Working GroupCommon
Requested byzhux
Contact email(s)zhux@tsinghua.edu.cn, gdwebb@bnl.gov,dsmirnov@bnl.gov
Contact phone(s)
PWG email(s)starspin-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Simulated background embedding (generator with real data as background for noise / pile-up studies)
Number of events300000 = 300 K
Magnetic Field---- SELECT MAGFIELD ----
Collision Typepp 500GeV
Centrality---- SELECT CENTRALITY ----
BFC tags
Production---- SELECT PRODUCTION TAG ----
Geometry: simu---- SELECT GEOMETRY ----
Geometry: reco---- SELECT GEOMETRY ----
Library---- SELECT STAR LIBRARY ----
Vertex optionLeave vertex to be reconstructed vertex, and use VFPPVnoCTB with beamline
Pileup optionNo
Detector Set
Data Sources
Real Data
File lookup 
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event1
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-0.5 < η < 0.5
Pt, GeV0 < Pt < 30