Run-12 W+/W- Cross Section Ratios (Prelim Request)

HF PWG Meeting Minutes by Zhenyu - 2015/03/26

1) Run14 Au+Au picoDst production - Round table discussion
60-70 M events, 20M events per day, 1TB per day for picoDst, 

Triggers for Run 15 p+Au

Drell-Yan QCD Bkg Suppression

Run-12 W+/W- Cross Section Ratios

STAR Management Meeting

2015-04-10 12:00
2015-04-10 13:30
America/New York
Friday, 10 April 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
1) run14 production
D0 signal for PR
https://drupal.star.bnl.gov/STAR/blog/mstftsm/d0-signal-pr-run14-auau-200-gev-official-production

2) run15 status
completion of trans, start long. 
p+Au program

3) BUR 16--17

4) NSAC resolution meeting (Berndt's talk)

5) Collaboration meeting

6) shifts

STAR Management Meeting

2015-04-03 12:00
2015-04-03 13:30
America/New York
Friday, 3 April 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
 
1) production status and next priority 

D0 peak to be shown at April 11 APS meeting by Howard 
from the official production. 

2) run status and switch to long. pp run

3) iTPC project (3.2M$ as an MIE project, need to revise the proposal) 

4) BUR and charges 
    collection of projection request to CAD

5) Collaboration meeting program and logistics 

6) He3+Au results (PHENIX) 

STAR Management Meeting

2015-03-27 12:00
2015-03-27 13:30
America/New York
Friday, 27 March 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
 
1) production status and next priorities 

2) production/analyses preparation for QM15

3) run15 status (optimization?)

4) BUR committee 

5) collaboration meeting logistics and program 

6) pp2pp request for special run (4 hours) 
 
https://drupal.star.bnl.gov/STAR/system/files/ETrunRequest_0.pdf

2009 inclusive jet cross section preliminary - 20150326 spin pwg

 

TPC Drift Velocity history

This post is a simple follow-up to this previously shown plot...

Group based quota on the PWG disk

General

Following a thread as per how to allocate disk space to users (see BA to GPS plan) here is a description on how to allocate disk space based on group rather than

run13 pp500 gain calibration -- MIP


**********************************************************************************************************************
MIP summary of period 2:  

Day 80

 I am positing two day 80 run mass plots calcualted with "all ones" for corrections. These are from Runs 16080002 and 16080003

Embedding Status

Speaker : Amilkar


Talk time : 12:00, Duration : 00:20

 

run 13 trigger algo version 3

 

Some files for John's UU asHBT study

Rho analysis report

Speaker : R. Debbe BNL


Talk time : 11:10, Duration : 00:20

pA triggers

Speaker : Igor Alekseev


Talk time : 10:50, Duration : 00:05

Run12 Pythia Fudge Factors

 

Rho analysis

Speaker : Ramiro Debbe ( BNL )


Talk time : 10:30, Duration : 00:20