Isobar CME baseline, preliminary request for QM2023
Updated on Wed, 2023-09-13 21:48. Originally created by fengyich on 2023-08-15 09:44.QM slides: drupal.star.bnl.gov/STAR/presentations/Q
2023-08-15 centrality meeting
Updated on Tue, 2023-08-15 09:22. Originally created by educkwort on 2023-08-15 09:22.
S&C management meeting
Updated on Tue, 2023-08-15 09:11 by geurts. Originally created by genevb on 2023-08-15 09:11. 2023-09-06 12:00
2023-09-06 13:00
America/New York
Wednesday, 6 September 2023
N/A, at 16:00 (GMT), duration : 01:00
N/A, at 16:00 (GMT), duration : 01:00
S&C management meeting
Updated on Tue, 2023-08-15 09:11 by geurts. Originally created by genevb on 2023-08-15 09:11. 2023-08-30 12:00
2023-08-30 13:00
America/New York
Wednesday, 30 August 2023
N/A, at 16:00 (GMT), duration : 01:00
N/A, at 16:00 (GMT), duration : 01:00
S&C management meeting
Updated on Tue, 2023-08-22 11:13 by geurts. Originally created by genevb on 2023-08-15 09:11. 2023-08-23 12:00
2023-08-23 13:00
America/New York
Wednesday, 23 August 2023
https://riceuniversity.zoom.us/j/99943071327?pwd=RHlaamc0bHJpS29tLzdpb2tDcWMyZz09, at 16:00 (GMT), duration : 01:00
https://riceuniversity.zoom.us/j/99943071327?pwd=RHlaamc0bHJpS29tLzdpb2tDcWMyZz09, at 16:00 (GMT), duration : 01:00
- updates from SDCC
- Physics Production
- calibration updates
- production updates
- embedding updates
- FWD-test Run22 production update
- AOB
Zoom Link: https://riceuniversity.zoom.us/j/99943071327?pwd=RHlaamc0bHJpS29tLzdpb2tDcWMyZz09
S&C management meeting
Updated on Wed, 2023-08-16 10:57 by testadmin. Originally created by genevb on 2023-08-15 09:11. 2023-08-16 12:00
2023-08-16 13:00
America/New York
Wednesday, 16 August 2023
N/A, at 16:00 (GMT), duration : 01:00
N/A, at 16:00 (GMT), duration : 01:00
- updates from SDCC
- Physics Production
- calibration updates
- production updates
- embedding updates
- spack/software installation management - next steps
- ROOT6
- FWD software status
- AOB
Time | Talk | Presenter |
---|---|---|
19:00 | embedding status ( 00:20 ) 1 file | Xianglei Zhu |
H3L FXT 3.5 GeV systematic uncertainty
Updated on Mon, 2023-12-18 08:08. Originally created by yjzhou19 on 2023-08-15 08:52.
Preliminary results: run15 pion-tagged jet ALL
Updated on Thu, 2023-09-14 22:11. Originally created by yiyu on 2023-08-15 01:43.Preliminary results of run15 double spin asymmetry of the pion-tagged jets. This results are going to shown at SPIN2023.
Data set
pp200long2_2015
Preliminary results: run15 Lambda and Kshort ALL
Updated on Thu, 2023-09-14 22:07. Originally created by yiyu on 2023-08-14 22:43.Preliminary results of run15 double spin asymmetry of the in-jet Lambda hyperon and Kshort meson. This results are going to shown at SPIN2023.
Preliminary result V3
Updated on Mon, 2023-08-14 22:00. Originally created by yh66 on 2023-08-14 22:00.
Preliminary result V3
Updated on Mon, 2023-08-14 22:00. Originally created by yh66 on 2023-08-14 22:00.
Preliminary request for QM
Updated on Mon, 2023-08-14 17:57. Originally created by yuno on 2023-08-14 17:57.Very low pT J/ψ production in Au+Au collisions at 200 GeV through the dimuon channel at STAR
Updated on Thu, 2025-04-24 09:39. Originally created by zli1 on 2023-08-14 13:59.Very low pT J/ψ production in Au+Au collisions at √sNN =200 GeV through the dimuon channel at STAR
KK_CF_pwg_response
Updated on Mon, 2023-08-14 12:46. Originally created by bfan on 2023-08-14 12:46.GPC 1st round on PRC
Updated on Mon, 2023-08-14 11:40. Originally created by starkong on 2023-08-14 11:39.
isobar lambda and hypernuclei measurements
Updated on Wed, 2023-08-16 07:44 by dsli. Originally created by yhleung2 on 2023-08-14 10:34.Pion / Kaon / Proton Spectra and dN/dy at sqrt(s_NN) = 14.6, 19.6, 27 GeV (QM23 Preliminary Request)
Updated on Wed, 2023-08-16 09:06. Originally created by harasty on 2023-08-14 10:34.Reference
Speaker : Matthew Harasty ( University of California, Davis )
Talk time : 10:20, Duration : 00:20