T-board and Inner Signal Cable
Updated on Fri, 2021-01-08 17:54. Originally created by yezhenyu on 2021-01-08 17:54.Speaker : Maowu Nie, Michael Capotosto ( SDU, BNL )
Talk time : 09:10, Duration : 00:10
STAR Forward Silicon Tracker Meeting
Updated on Fri, 2021-01-08 17:53. Originally created by yezhenyu on 2021-01-08 17:53. 2021-01-11 08:30
America/New York
Monday, 11 January 2021
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 13:30 (GMT), duration : 00:00
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 13:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
08:30 | Follow-up on action items ( 00:15 ) 0 files | all |
09:00 | Integration ( 00:20 ) 0 files | Rahul Sharma, Felix Archampong (BNL) |
09:10 | T-board and Inner Signal Cable ( 00:10 ) 0 files | Maowu Nie, Michael Capotosto (SDU, BNL) |
09:20 | Mechanical Structure ( 00:10 ) 2 files | Yi Yang (NCKU) |
09:30 | Production module assembly ( 00:10 ) 1 file | Xu Sun (UIC) |
R-corr detective work for STAR Run11AuAu200GeV data
Updated on Fri, 2021-01-08 13:05. Originally created by fengyich on 2021-01-08 13:05.
APS2021_abstract_Light Nuclei Production in Fixed-target Au+Au Collisions at √sNN = 3 GeV from STAR experiment
Updated on Thu, 2021-01-07 23:01. Originally created by huiliu on 2021-01-07 22:42.
Identified particle spectra in isobaric collisions of Ru+Ru and Zr+Zr at sqrt(sNN) = 200 GeV with the STAR experiment
Updated on Thu, 2021-01-07 20:12. Originally created by yali on 2021-01-07 20:12.
Identified particle spectra in isobaric collisions of Ru+Ru and Zr+Zr at sqrt(sNN) = 200 GeV with the STAR experiment
Updated on Thu, 2021-01-07 20:12. Originally created by yali on 2021-01-07 20:12.
Identified particle spectra in isobaric collisions of Ru+Ru and Zr+Zr at sqrt(sNN) = 200 GeV with the STAR experiment
Updated on Thu, 2021-01-07 20:12. Originally created by yali on 2021-01-07 20:12.
PWGC Documents
Updated on Fri, 2021-01-08 03:34. Originally created by zurek on 2021-01-07 14:19. PWGC Report - Analysis Meeting: 01//08/2021
SpaceCharge EastWest Symmetry
This is meant to provide a simple document for understanding through basic principles of electromagnetism how the TPC SpaceCharge distortion is symmetric on the east and west sides of the TPC.
Internal Documents for small system
Updated on Wed, 2021-01-06 20:47. Originally created by slhuang on 2021-01-06 20:43. This is webpage for collection of internal documents for small system flow
1)The analysis note which is sent to PAC in June/2020
Alignment Update
Updated on Wed, 2021-01-06 14:58. Originally created by iraklic on 2021-01-06 14:58.Forward Silicon Tracker Module Production and Readout Test at Fermi lab
Updated on Fri, 2021-04-23 19:38 by shenghui. Originally created by sunxuhit on 2021-01-06 14:41.Test Stand Setup
TPC QA 2021
This blog is intended to maintain a log of issues that will be identified as the
run progresses. For initial start the process will be as for run20 and 19. See earlier QA blog page
TPC Distortions (progress report)
Updated on Wed, 2021-01-06 15:11. Originally created by fisyak on 2021-01-06 12:33.Position resolution of pentagon prototype based on TPX electronics
Updated on Wed, 2021-01-06 08:22. Originally created by yshi on 2021-01-06 08:22.Reference
Speaker : Yingying Shi
Talk time : 08:50, Duration : 00:20
Position resolution of pentagon prototype based on TPX electronics
Updated on Wed, 2021-01-06 08:21. Originally created by yshi on 2021-01-06 08:21.Reference
Speaker : Yingying Shi
Talk time : 08:50, Duration : 00:20
Position resolution of pentagon prototype based on TPX electronics
Updated on Wed, 2021-01-06 08:20. Originally created by yshi on 2021-01-06 08:20.Reference
Speaker : Yingying Shi
Talk time : 08:30, Duration : 00:20
Analysis meeting report
Updated on Wed, 2021-01-06 04:56. Originally created by petrchal on 2021-01-06 04:56.Speaker : Petr Chaloupka
Talk time : 10:00, Duration : 00:20
Preliminary results for IS2021
Updated on Wed, 2021-01-06 01:16. Originally created by nie on 2021-01-06 01:16.