S&C Offline Software

2019-10-17 16:00
2019-10-17 17:00
America/New York
Thursday, 17 October 2019
1-189, at 20:00 (GMT), duration : 01:00

Offline roundtable.
TimeTalkPresenter
16:00Materials for Discussion ( 00:20 ) 0 files

Run 17 beam positions

In hopes of finding some causal correlation with fill-by-fill variations in the high-pT ratios of global tracks in Run 17 pp510 data, I looked for possible clues in the beam position data.<

STAR Forward Silicon Tracker Meeting

2019-10-18 10:30
2019-10-18 11:30
America/New York
Friday, 18 October 2019
https://bluejeans.com/101020434 , at 14:30 (GMT), duration : 01:00
Minutes from meeting

 



Would it be possible to have a meeting (remote) on this tomorrow Friday pref in the morning.   (10/18)

 
-discussion

a) what went wrong here (my interpretaation of mike e-mail)

b) what is the correct design

c) who/when will it be done

c) signoff before we proceed as its clearly not ready for production as mike put the assembly on hold

 

n  Need to update documentationoduction.

Mike’s e-mail

 

Not sure who to address this to - I've asked the vendor to hold off on putting the test stand cables on the T-board, as I've noticed some discrepancies.  (Very good).

 

The attached Excel spreadsheet from Steve Valentino was used when ordering the test stand cables. Each wire/pair is labeled using the "Via Ref Des" column, in column "G", which corresponds to the D-Sub connector pin listed in column A.

 

When compared to the schematic for T-Board V2.0 the Via Ref Des is incorrect - the correct values according to the schematic are listed in Column I. This affected only OUT0 through OUT3. They are in reverse order, and some also have polarity reversed. This affects the first V2.0 test T-Boards we assembled.

 

Zhenyu, I believe these were sent to you, if so just be aware.  

 

When compared to the T-Board V2.1 the Via Ref Des is incorrect - the correct values according to the schematic are listed in Column J. This affected only OUT0 through OUT2. OUT3 is correctly labeled. OUT0 through OUT2 all have polarity reversed.

 

I do not know the reason for the Via Ref Des changes between schematic/pcb revisions, or why the spreadsheet appears incorrect for both V2.0 and V2.1

 

I would appreciate it if someone could tell me if my assumption regarding the correct labeling for the cable should be what I’ve listed in Column J, and if not let me know what it should be.

 

Who designed the version 2.1. Who double checked it?

We seem to be lacking some QA process.

 

 

10/18 - message

 After checking all versions for T-board, I find that Column G is related to the original version which wasn't produced, and Column I related to T2.0
 Column J related to T2.1.
 The changes for different versions are just for easy and quick routing.
 I'm sorry I didn't figure it out clearly when I updated the design.
 Is it possible to update the mapping now?

 


 

 

 

 

191017 HF Weekly Meeting

 

Updated errors to c->e v1 and b,c->e RAA

QM_slides_focusmeet

 

scp through an intermediate node - using a tunel

OK so I already provided help for tunneling for special services (Web access for example - see Creating an SSH tunnel in Linux ) but was asked a few times how to copy files in and out of BNL or in between enclave.

Femtoscopy in small systems for Bulk/Corr PWG meeting October 16, 2019

Presentation about femtoscopy is small systems for Bulk/Corr PWG meeting October 16, 2019

Quark Matter 2019: Poster

 

small system flow

 

event-by-event charge separation at AuAu200

Speaker : Jagbir singh ( Panjab University, INIDA )


Talk time : 09:30, Duration : 00:20

Centrality determination for fluctuation in PWG 191016

 

QM2019-poster-wujin

 Thanks

QM2019 poster draft Yue Liang for ESE D0 v2

 

Module Assmbly

Speaker : Zhenyu Ye


Talk time : 10:00, Duration : 00:20

 

Tong Liu's QM poster

 

Weird distirbution in RUN15 day6669 - run QA

- Further QA for the weird splitting distribution in following conditions:
   a. day 6669

News

Reference


Talk time : 00:00, Duration : 00:00

Hamamatsu silicon sensor

Reference


Talk time : 00:00, Duration : 00:00

Hybridbrid, T-board, Inner Signal Cable

Reference


Talk time : 00:00, Duration : 00:00