BulkCorr QA

Reference


Talk time : 00:00, Duration : 00:00

HLT QA

Reference


Talk time : 00:00, Duration : 00:00

LFS_UPC QA

Reference


Talk time : 00:00, Duration : 00:00

BulkCorr QA

Reference


Talk time : 00:00, Duration : 00:00

HLT QA

Reference


Talk time : 00:00, Duration : 00:00

LFS_UPC QA

Reference


Talk time : 00:00, Duration : 00:00

BulkCorr QA

Reference


Talk time : 00:00, Duration : 00:00

HLT QA

Reference


Talk time : 00:00, Duration : 00:00

Run 15 BEMC Calibration: Gain Calculation

 Fits_FixedBins.pdf shows how the histograms are fitted with equal width bins (0.5 GeV bins from 1.5 - 4.5 GeV for JP, and 1.5 - 3 GeV for HT).

DNP2019_Abstract

 

DNP2019_Abstract

 

D0 v1 BNL

 

Comments on paper drafts (2019)

 

QM19 poster abstract - Xiujun

 

190619_Document of dimensions and output files for the new hybrids and T-board (v2_1)

 

DNP 2019 abstract

 

TPC Meeting

2019-06-19 15:00
2019-06-19 15:00
America/New York
Wednesday, 19 June 2019
1-189, at 19:00 (GMT), duration : 00:00

Meeting Location - BNL Room 1-189



The Bluejean connection

Title:  STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR

Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))

Meeting ID: 276 827 050

Direct link: https://bnl.bluejeans.com/276827050

Presentation June 18th

6/18/2019 Lab Meeting

Link to Presentation: https://docs.google.com/presentation/d/1zY6Ki8nw0RoOXJOl882zo8HyPvfzBwsHAl0rtCYR9ak/edit?usp=sharing

BES Focus Group

2019-06-18 16:00
America/New York
Tuesday, 18 June 2019
bluejeans 221495232, at 20:00 (GMT), duration : 00:00
BES Analysis Efforts

DNP Abstracts

Calibrations/QA/Production