Software and Computing

K Minus

P06ib: Plots_Nfit-KMinus-nfit_0.20pT0.30_0nch1000
P06ib: K minus 0.20pT0.30_0nch1000

      

Pi Plus

P06ib: Plots_Nfit-PiPlusMinus-nfit_0.20pT0.30_0nch1000
P06ib: Pi plus 0.20pT0.30_0nch1000

      

Pi Minus

P06ib: Plots_Nfit-PiMinus-nfit_0.20pT0.30_0nch1000
P06ib: Pi minus 0.20pT0.30_0nch1000

      

Plots - Number of Fitted Points

The Following are the results for dca distributions for different pT bins in Pi Minus. The results of dca agrees reasonable for the cut-off of 2 cm and above. These plots were done using the macro plot_dca.C

Plot_Hits.C

void plotHits() { gROOT->LoadMacro("~/mymacros/Utility.C"); // f = new TFile("PiPlus200_SimDb_p2.root","read"); //f = new TFile("PiMinus200_SimDb_lowTest_03pt04.root","read");

Scan-Hits.C

#ifndef __CINT__ #include "TROOT.h" #include "TSystem.h" #include #include "TH1.h" #include "TH2.h" #include "TH3.h" #include "TFile.h" #include "TTree.h" #include "TChain.h"

Jobs Done

P06ib:
6050022_1050001.28606: /eliza5/starprod/embedding/P06ib
6050022_1050001.7247: /eliza5/starprod/embedding/P06ib
6050022_1060001.3717: /eliza5/starprod/embedding/P06ib
 6050022_1070001.10533: /eliza5/starprod/embedding/P06ib

P05ic



Missing /Dead Areas

Hits-P05ic_200gev_auau-PiMinus_hitsXYeast_p2.gif

P07ib

Test done on P07ib - Doing claibration on dE/dx

K star

Files: pdsf>/eliza1/starprod/embedding/KstarM* ( July 31 2007)

Plots - Dca Distributions


The Following are the results for dca distributions for different pT bins in Pi Minus. The results of dca agrees reasonable for the cut-off of 2 cm and above. These plots were done using the macro plot_dca.C

Event Selection Criteria

    * Production: P06ib
    * Vertex restriction: |x|<3.5cm, |y|<3.5cm, |z|<25.0cm
    * N Fit points >= 25
    * DCA < 3 cm

  • PiMinus

 P06ib: Plots-DCA-PiMinus-dca_0.20pT0.30_0nch1000

P06ib: Plots-DCA-PiMinus-dca_0.30pT0.40_0nch1000

Run VII preparation, meeting #3

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
TimeTalkPresenter
16:30SSH key management ( 00:10 ) 1 fileJerome Lauret
16:40Purchase priorities ( 00:10 ) 0 filesJerome Lauret, ...
16:50Sub-system's required resources to date ( 00:05 ) 0 filesJerome Lauret
16:55Network Spaghetti - news and update ( 00:10 ) 0 filesMike DePhillips, Wayne Betts, ...
17:05Windows and Linux upgrade status ( 00:10 ) 0 filesWayne Betts
17:15Event tag database, overview of plans and current status ( 00:10 ) 0 filesJeffery Landgraf, Mike Dephillips, ...
17:25AOB ( 00:10 ) 0 filesAll

Run VII

Background

Facing a new paradigm of introducing CyberSecurity DOE regulations into our infrastructure, several action items were presented at t

200607

There was no specific agenda but topics were at the end
  • Follow-ups on past action items and issues

2006 documents

This page is being built.

At the bottom of this page, we have several documents written in 2006 as part of the Cyber-Security effort to describe sub-systems in the research enclave.

Security

The interface to DOE Cyber Securiry and security contact for STAR is the Software & Computing leader.

SVT/SSD Review Coordination meeting 7

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
Previous meetings are available at
  1. [node:1297]
  2. [node:1540]
  3. [node:1568]
  4. [node:2299]
  5. [node:2298]
  6. [node:2300]
Attendance: Jamie, Lidia, Gene, Maxim, Rene, Christina, Yuri, Victor and Thomas
Phone: Spiros



TimeTalkPresenter
17:00Review charges reminder, logistic ( 00:10 ) 0 filesMyself (BNL)
17:10Data set status and location summary ( 00:10 ) 0 filesLidia Didenko (BNL)
17:20Planned analysis and who is going to make presentations ( 00:30 ) 0 filesAll (All)

200412

Topics were
  • Review of run preparation issues and action items
  • Electronic ShiftLog improvements
  • ITTF issue: Action plan to converge fast and efficiently
  • ITTF opened issues seen by all, opinion gathering

200509

Topics were
  • Vacation days issue (overdues and penalties when not declared)
  • Hiring and budget situation
  • Purchase justifications
  • Safety issues at BNL
  • Cyber-security
  • Quality of our data, general QA issues

200510

Agenda was:
  • Feedback on new appraisal Web-based system
  • CHEP06 preparation and who wants to go (or should go)
  • Gene's overview of the TIME05 conference
  • ITD service evaluation survey