STAR Protected
NPE-hadron correlations in Au+Au 200 GeV run 11
Updated on Wed, 2014-02-12 14:13 by jaydunk. Originally created by kikola on 2014-02-08 09:31.Reference
Speaker : Jay Dunkelberger
Talk time : 14:40, Duration : 00:40
NPE production in Au+Au 62GeV and 39 GeV
Updated on Wed, 2014-02-12 13:33 by mstftsm. Originally created by kikola on 2014-02-08 09:30.
Reference
Speaker : Mustafa Mustafa
Talk time : 14:00, Duration : 00:40
D0 in U+U collisions Run 12
Updated on Wed, 2014-02-12 08:16 by yezhenyu. Originally created by kikola on 2014-02-08 09:29.
Reference
Speaker : Zhenyu Ye
Talk time : 11:20, Duration : 00:40
D0 analysis in pp 200 GeV with Run 12 data
Updated on Wed, 2014-02-12 00:18 by qiuh. Originally created by kikola on 2014-02-08 09:28.
Reference
Speaker : Hao Qiu
Talk time : 09:40, Duration : 00:40
D* analysis in p+p 500 GeV BHT data
Updated on Wed, 2014-02-12 08:56 by tlusty. Originally created by kikola on 2014-02-08 09:27.
Reference
Speaker : David Tlusty
Talk time : 09:00, Duration : 00:40
Measurement of NPE in p+p at 200GeV Run 12
Updated on Fri, 2014-02-14 12:00 by xiao00. Originally created by kikola on 2014-02-08 09:25.Reference
Speaker : Xiaozhi Bai
Talk time : 10:40, Duration : 00:40
Coffee break
Updated on Mon, 2014-02-10 17:26. Originally created by kikola on 2014-02-08 09:23.Reference
Talk time : 15:20, Duration : 00:20
J/psi polarization in p+p 500 GeV run 11
Updated on Tue, 2014-02-11 14:47 by trzeciak. Originally created by kikola on 2014-02-08 09:22.
Reference
Speaker : Barbara Trzeciak
Talk time : 15:40, Duration : 00:40
Upsilon production in U+U collisions at 193 GeV
Updated on Tue, 2014-02-11 10:37 by rvertesi. Originally created by kikola on 2014-02-08 09:20.
Reference
Speaker : Robert Vertesi
Talk time : 11:20, Duration : 00:40
J/psi in min-bias U+U collisions at 193 GeV
Updated on Tue, 2014-02-11 10:51 by kukral. Originally created by kikola on 2014-02-08 09:19.
Reference
Speaker : Ota Kukral
Talk time : 10:40, Duration : 00:40
J/psi in U+U collisions with HT trigger
Updated on Tue, 2014-02-11 08:11 by xgn1992. Originally created by kikola on 2014-02-08 09:17.
Reference
Speaker : Guannan Xie
Talk time : 09:40, Duration : 00:40
Paper Submission Process
Updated on Mon, 2014-02-10 13:31 by trzeciak. Originally created by wanghui6 on 2014-02-07 14:01.
Reference
Speaker : Barbara Trzeciak
Talk time : 14:30, Duration : 00:30
Magnetic Shielding tests update
Attatched is my report on our latest round of magnetic shield testing at PSU.
STAR Management Meeting (new time starting Thursday, Sept. 26, 2013)
BNL, Buld 510, I-189, at 15:00 (GMT), duration : 01:00
STAR Management Weekly Meeting // Community: STAR // Password: star
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eleBevv8vDatasIuanIl
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 16 0807 // Password: 0952
*--===================================================================--*
I. Agenda:
1) News:
2) STAR Run14 Status: Bill
3) HFT status: Flemming
4) QM2014 abstracts: Xin / Nu
5) TBC
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:
*--===================================================================--*
III. Note:
► BES-II White Paper Committee
- co-chairs: D. Cebra and B. Mohanty
- Deadline: March 1, 2014
- BNL charges: pdf file
- STAR charges: doc file
► pp/pA Committee
- co-chairs: E. Aschenauer, H. Huang and E. Sichtermann
- Deadline: April 30, 2014
- BNL charges: pdf file
- STAR charges: doc file
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
BNL Charges to "LOI transition from RHIC to eRHIC": doc file
LOI Committee Membership and charges: doc file
Preliminary Draft eSTAR LoI (Sept. 15th, v14) (pdf)
► Tribble Committee Presentation, 1/28/2013
► RHIC WhitePaper: The Case for Continuing RHIC Operations 9/2/2012
► DNP HI WhitePaper: Hot and Dense QCD Matter
► RHIC Spin WhitePaper: The RHIC Spin Program
► EIC WhitePaper: Electron Ion Collider: The Next QCD Frontie
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
IV. Future Meetings and Reviews
► STAR Collaboration Meeting, BNL, Feb. 10 - 14, 2014. Chair: Zhangbu Xu
► APS, April Meeting, Savannah, GA, April 5 - 8, 2014. Abstract deadline: Jan. 10, 2014
► STAR Collaboration Meeting, Frankfurt, Germany, May 12 - 16, 2014. Chair: Ivan Kisel
► QM2014, Darmstadt, Germany, May 19 - 24, 2014. Abstract deadline: Feb. 15, 2014
*--===================================================================--*
STAR Management Meeting (11am EDT)
BNL, Buld 510, I-189, at 15:00 (GMT), duration : 01:00
STAR Management Weekly Meeting // Community: STAR // Password: star
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eleBevv8vDatasIuanIl
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 16 0807 // Password: 0952
*--===================================================================--*
I. Agenda:
1) News:
2) STAR Run14 Status: Bill
3) HFT status: Flemming
4) FGT: Flemming (Document to DOE: file)
5) QM abstract submissions: Xin
6) TBC
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:
*--===================================================================--*
III. Note:
► BES-II White Paper Committee
- co-chairs: D. Cebra and B. Mohanty
- Deadline: March 1, 2014
- BNL charges: pdf file
- STAR charges: doc file
► pp/pA Committee
- co-chairs: E. Aschenauer, H. Huang and E. Sichtermann
- Deadline: April 30, 2014
- BNL charges: pdf file
- STAR charges: doc file
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
BNL Charges to "LOI transition from RHIC to eRHIC": doc file
LOI Committee Membership and charges: doc file
Preliminary Draft eSTAR LoI (Sept. 15th, v14) (pdf)
► Tribble Committee Presentation, 1/28/2013
► RHIC WhitePaper: The Case for Continuing RHIC Operations 9/2/2012
► DNP HI WhitePaper: Hot and Dense QCD Matter
► RHIC Spin WhitePaper: The RHIC Spin Program
► EIC WhitePaper: Electron Ion Collider: The Next QCD Frontie
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
IV. Future Meetings and Reviews
► STAR Collaboration Meeting, BNL, Feb. 10 - 14, 2014. Chair: Zhangbu Xu
► APS, April Meeting, Savannah, GA, April 5 - 8, 2014. Abstract deadline: Jan. 10, 2014
► STAR Collaboration Meeting, Frankfurt, Germany, May 12 - 16, 2014. Chair: Ivan Kisel
► QM2014, Darmstadt, Germany, May 19 - 24, 2014. Abstract deadline: Feb. 15, 2014
*--===================================================================--*
STAR Management Meeting
BNL, Buld 510, I-189, at 15:00 (GMT), duration : 01:00
STAR Management Weekly Meeting // Community: STAR // Password: star
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eleBevv8vDatasIuanIl
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 16 0807 // Password: 0952
*--===================================================================--*
I. Agenda:
1) News:
2) STAR Run14 Status: Bill
3) HFT status: Flemming / Xin
4) 22-week run shift dues: Jerome
5) TBD
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:
*--===================================================================--*
III. Note:
► BES-II White Paper Committee
- co-chairs: D. Cebra and B. Mohanty
- Deadline: March 1, 2014
- BNL charges: pdf file
- STAR charges: doc file
► pp/pA Committee
- co-chairs: E. Aschenauer, H. Huang and E. Sichtermann
- Deadline: April 30, 2014
- BNL charges: pdf file
- STAR charges: doc file
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
BNL Charges to "LOI transition from RHIC to eRHIC": doc file
LOI Committee Membership and charges: doc file
Preliminary Draft eSTAR LoI (Sept. 15th, v14) (pdf)
► Tribble Committee Presentation, 1/28/2013
► RHIC WhitePaper: The Case for Continuing RHIC Operations 9/2/2012
► DNP HI WhitePaper: Hot and Dense QCD Matter
► RHIC Spin WhitePaper: The RHIC Spin Program
► EIC WhitePaper: Electron Ion Collider: The Next QCD Frontie
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
IV. Future Meetings and Reviews
► STAR Collaboration Meeting, BNL, Feb. 10 - 14, 2014. Chair: Zhangbu Xu
► APS, April Meeting, Savannah, GA, April 5 - 8, 2014. Abstract deadline: Jan. 10, 2014
► STAR Collaboration Meeting, Frankfurt, Germany, May 12 - 16, 2014. Chair: Ivan Kisel
► QM2014, Darmstadt, Germany, May 19 - 24, 2014. Abstract deadline: Feb. 15, 2014
*--===================================================================--*
STAR Management Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
STAR Management Weekly Meeting // Community: STAR // Password: star
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eleBevv8vDatasIuanIl
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 16 0807 // Password: 0952
*--===================================================================--*
I. Agenda:
1) News:
2) STAR Run14 Status: Bill
3) BES-II WP Status: Dan / Bedanga
4) QM2014 abstract: Xin (link to the list of abstracts, as of Jan. 21, 2014)
5) Election issue(?): Nu
6) TBD
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:
*--===================================================================--*
III. Note:
► BES-II White Paper Committee
- co-chairs: D. Cebra and B. Mohanty
- Deadline: March 1, 2014
- BNL charges: pdf file
- STAR charges: doc file
► pp/pA Committee
- co-chairs: E. Aschenauer, H. Huang and E. Sichtermann
- Deadline: April 30, 2014
- BNL charges: pdf file
- STAR charges: doc file
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
BNL Charges to "LOI transition from RHIC to eRHIC": doc file
LOI Committee Membership and charges: doc file
Preliminary Draft eSTAR LoI (Sept. 15th, v14) (pdf)
► Tribble Committee Presentation, 1/28/2013
► RHIC WhitePaper: The Case for Continuing RHIC Operations 9/2/2012
► DNP HI WhitePaper: Hot and Dense QCD Matter
► RHIC Spin WhitePaper: The RHIC Spin Program
► EIC WhitePaper: Electron Ion Collider: The Next QCD Frontie
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
IV. Future Meetings and Reviews
► STAR Collaboration Meeting, BNL, Feb. 10 - 14, 2014. Chair: Zhangbu Xu
► APS, April Meeting, Savannah, GA, April 5 - 8, 2014. Abstract deadline: Jan. 10, 2014
► STAR Collaboration Meeting, Frankfurt, Germany, May 12 - 16, 2014. Chair: Ivan Kisel
► QM2014, Darmstadt, Germany, May 19 - 24, 2014. Abstract deadline: Feb. 15, 2014
*--===================================================================--*
STAR R&D 2014 and iTPC Review
Physics Department BNL room 2-84, at 14:30 (GMT), duration : 00:00
Proposals are available at
https://drupal.star.bnl.gov/STAR/future/star-rd-and-upgrades-2014
In addition we will review the status of the iTPC proposal. Talks are nominaly 20 + 10 for questions , discussion
The Seevogh information is
Title: STAR R&D
Description: STAR R&D review
Community: STAR
Password: star
Meeting type: Open Meeting (Round Table)
Meeting Access Information:
- Meeting URL
SeeVogh R.N. http://research.seevogh.com/join?meeting=MaMDMt2v22DvDe929sDI9a
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MaMDMt2v22DvDe929sDI9a
- Password: star
- Phone Bridge
ID: 680 8572
Password: 0952
Time | Talk | Presenter |
---|---|---|
09:30 | Introduction ( 00:10 ) 1 file | F.Videbæk |
09:40 | R&D proposal for an Event Plane Detector ( 00:30 ) 1 file | A.Schmah |
10:10 | R&D towards end-cap annuli (eTOF) ( 00:30 ) 1 file | Frank Geurts (Rice Univ.) |
10:40 | R&D for Forward Tracking System at STAR ( 00:30 ) 1 file | Zhenyu Ye |
11:10 | break ( 00:20 ) 0 files | |
11:30 | Proposal to develop new TDC capability for STAR ( 00:30 ) 1 file | H.Crawford |
12:00 | iTPC Electronics Status & R&D request ( 00:30 ) 1 file | Tonko Ljubicic (BNL) |
12:30 | review panel working lunch ( 01:30 ) 0 files | |
14:00 | iTPC Status Report ( 00:20 ) 1 file | Zhangbu Xu (BNL) |
14:20 | Physics cases (BES II) ( 00:20 ) 1 file | Bedanga Mohanty (NISER) |
14:40 | Status of MWPC construction plan in China ( 00:20 ) 1 file | Qinghua Xu (Shandong University) |
15:00 | Discussions on Mechanic design/Engineering plan ( 00:20 ) 1 file | iTPC group |
iFEE schematic update 01_07_2014
IFEE prototype CCA design notes:
https://docs.google.com/file/d/0B646cEWOsHZKaVdxczBjVDZvazg/edit?pli=1