SN0397 : A Final Design Review (FDR) for the STAR EMC

Author(s):R. Brown, A. Pendzick, S. White, B. Christie, H. Matis, H. Wieman, Y. Makdisi, B. Edwards,
Date:Apr. 29, 1999
File(s):sn0397.pdf
Abstract:A Final Design Review (FDR) for the STAR EMC was held on February 24th and 25th, 1999 at Brookhaven National Lab.
The review covered design requirements, analyses, hardware design, optical system design, installation tooling, module assembly plans and installation schedule of the Barrel Tile Calorimeter and Shower Max. A secondary purpose of the review was to communicate the RHIC and STAR standards and requirements for drawings and documentation, procedures, safety review and operational readiness reviews.
Keywords:
Category:Technical