Sort by:[Date]

Run 13 BEMC Calibration : Relative Calibration [MIP analysis]

Run 13 BEMC Calibration : Relative Calibration [MIP analysis]  
Run-13 -Period1 BEMC-Calibration
Distributions requested by EMC meeting on 11/10/15 of various trigger options : (click here)
 
 

*******************
cluster_eng_momentum_cut_for_outtermost2_eta_rings

EMC-draft-08-18-15


compare <E/P> vs 1/3x3 isolation ratio (ratio-not corrected) between E in <E/P> is corrected single tower energy  and  E in <E/P> being non-corrected 2x2 cluster energy. ---plots
 
clusterEng_E/Pfit_ringbyring

2x2cluserEng VS TDR and singleTowerEng Vs TDR

TDR-Vs-1/3x3_isolation

TDR-1D distribution_ring-by-ring--BHT3 trigger 

 

 




MIP-Gain-Luminosity dependance-period1
zdc1 -> <zdc> ~200K - (MIPGain
zdc1 -MIPGainzdc2)/ MIPGainzdc1 


 

BHT3 - threshold=7.3 GeV

conditions:

if  ( ( (BHT3&&BHT3->DidFire()) && !(BHT2&&BHT2->DidFire()) &&
!(BHT1&&BHT1->DidFire()) &&  !(BHT0&&BHT0->DidFire() ) )
   {
 BHT3->Fill();


EoverPvsP      meanE/PvsP

********************************
BHT2- 
threshold=6.0 GeV
condition:

if ( ( (BHT2&&BHT2->DidFire()) && !(BHT1&&BHT1->DidFire()) &&
!(BHT0&&BHT0->DidFire() ) )
       {
 BHT2->Fill();

EoverPvsP      meanE/PvsP
********************************

BHT1 - 
threshold=4.2 GeV
condition:

if ( ( (BHT1&&BHT1->DidFire()) && ! (BHT0&&BHT0->DidFire() ) )
    {
 BHT1->Fill();

EoverPvsP      meanE/PvsP

********************************
BHT0 - 
threshold=2.6 GeV
condition:
if  (BHT0&&BHT0->DidFire())  BHT0->Fill()

EoverPvsP      meanE/PvsP

********************************

JP2
Condition:
if  (JP2&&JP2->DidFire())  JP2->Fill()

EoverPvsP   Mom-5-10   Mom-7-10  meanE/PvsP



Forward Upgrade Proposal / GSTAR Implementation (10 disk) - GEM option

 

No. of primary track versus HFT hit pattern for AuAu200 low luminosity run 2014

    A plot below was taken from Track By Track comparision of TPC only and TPC+HFT reconstruction for y2014 AuAu200 low luminosity runs (days 84-90) (see http://www.usatlas.bnl.gov/~fisyak/s

Forward Upgrade Proposal / R&D needs - GEM option

 

Proposed FMS target gains

OSU EPD Testbench WITH PAGE NUMBERS

OSU EPD Testbench, BES meeting Feb23 2015

 

Iteration0

 I am starting the analysis data with iteration 0 voltages (but with 1 crate of Lecroy supplies for Large South removed)

DIS 2015 Abstract

 

Run 15 Tests 1

The following is the distribution of the sum of ADC counts  for run 16049006 and short trigger test  runs 16050060, 16050061,  16050062.