Sort by:[Date]

Trigger Board Feb 17th mid-rapidity spin update

EPD test bench hardware

Run15 VPDMB-5 trigger commission

 VPD slewing calibration table was implemented on Feb. 13.

SSD chip gain calib

Calibration table for SSD chip

proposal to change the gain calibration to be done at the DaqMaker level.

Forward Upgrade Proposal / Simulations - GEM option

Simulation results using tracking optimization package: »

Run12 BEMC Calibration: Spin-PWG Update

 

DIS 2015 W+/W- Abstract

 Abstract to be submitted to Structure Function / Hadronic Final-State session at DIS 2015

test (dummy page to test a BNL internal WS)

SSD run 15 pp

physics run : /star/data03/daq/2015/045/16045104/st_physics_16045104_raw_2000009.daq

Hot

BEMC Trigger Database Monitoring

This task has been done by the BEMC Software Coordinator for run14 and run15. The task is relatively simple, if all of the code works together appropriately. The steps are relatively simple.