Proposals
The page contains the documents for proposal, new, those upgrades in progress and the past proposal for upgrades that has been implemented. Review committees for the new proposals (Fall 2009) has been established. The charge and process for assessing and prioritizing these are given in the attached file.
Ongoing upgrades
eSTAR LoI and details at its bookpage
an Upgrade to the Inner Sectors of STAR Time Projection Chamber
HFT+ (an upgrade to HFT in 2020)
Forward Upgrade (Forward Calorimeter System and Forward Tracking System)
Heavy Flavor tracker
Heavy Flavor Tracker - June 8, 2006
Heavy Flavor Tracker - October 10, 2007
HFT CD-0 Review Report
January 9, 2009: Letter to BNL; Report: Final version; Excerpts
Conceptual Design Report, Nov 11, 2009
Future material will be posted on the child page HFT project
Forward Gem Tracker (FGT)
Forward GEM Tracker- December 29, 2007(MIT link) local link
Quarterly report Q1Fy11
New Proposals
High Level Trigger (HLT)
LOI 2009 -- committee report (4/6/2009)
Final report from on proposal, February 2010
Muon Telescope Detector (MTD)
Proposal October 2009
Report from Commitee received Jan 21, 2010
Revised Proposal February 10, 2010 submitted to BNL management.
A BNL lead review with DOE participation was held on September 17 2010. The talks are available at http://www.star.bnl.gov/~ruanlj/MTDreview2010/mtd.htm . The final report from the commitee was received October 23 2010.
Forward Hadron Calorimeter (FHC)
HCAL East Proposal (July 28 2016)
HCAL_proposal_140510.pdf (May 19, 2014)
Forward Hadronic Calorimeter- November 15, 2008
Forward Hadron Calorimeter revised proposal- October, 2009
The document above is a combined, memo, old proposal, review report and upgrade to the original proposal including comments to review report question.
Report from the review committee received December 03, 2009
Phase II of physics with tagged forward protons
Glueball Search and Diffractive Physics with the STAR Detector at RHIC - proposal, November 2009
Final Report February 2010
Revised proposal submitted to BNL August 5, 2010
Older proposal
upgrades that have now been completed. Kept for historical reference.
Time of Flight - May 24, 2004
Forward Meson Spectrometer - Jan., 13, 2005
DAQ 1000 - March 22, 2005
Tagged Forward Protons - July 12, 2005