FY04

Under:
Project Start Date: Fri 1/2/04
Project Finish Date: Mon 10/25/04

STAR FY04 v3 Shutdown


ID
Name
DurationStart_DateFinish_DateResource_NamesPredecessorsSuccessors
1
STAR Detector Operations
211.35 daysMon 1/5/04Mon 10/25/04   
2
Physics Run FY04
96 daysMon 1/5/04Sat 5/15/04  5FF
3
Start Shutdown Activities
116.35 daysSat 5/15/04Mon 10/25/04   
4
Move Detector into AB
14.6 daysSat 5/15/04Thu 6/3/04   
5
Purge TPC Gas
1 daySat 5/15/04Sat 5/15/04 2FF6SS
6
Subsystem Testing
6 daysSat 5/15/04Fri 5/21/04 5SS7
7
Retract PMD Detector
0.1 daysMon 5/24/04Mon 5/24/04Mech.Tech.68
8
Remove East BBC Detector
0.25 daysMon 5/24/04Mon 5/24/04Mech.Tech.79
9
Retract East Pole Tip
0.5 daysMon 5/24/04Mon 5/24/04Mech.Tech.[2]810FF
10
Install Scaffold
0.25 daysMon 5/24/04Mon 5/24/04Carpenter[2]9FF12,11
11
Remove Shield Wall
2.5 daysMon 5/24/04Thu 5/27/04Riggers[3]1026,23,16SS,18,135
12
Remove West Pole Tip Utilities
0.25 daysMon 5/24/04Tue 5/25/04Mech.Tech.1013
13
Remove West BBC Detector
0.25 daysTue 5/25/04Tue 5/25/04Mech.Tech.1214
14
Retract West Pole Tip
0.5 daysTue 5/25/04Tue 5/25/04Mech.Tech.[2]1315FF
15
Install Scaffold
0.13 daysTue 5/25/04Tue 5/25/04Carpenter[2]14FF 
16
Disconnect Electrical Power
0.5 daysMon 5/24/04Tue 5/25/04Electrician[2]11SS18,17
17
Disconnect Magnet Power
0.5 daysTue 5/25/04Tue 5/25/04Elect.Tech.[2]1618
18
Remove Buss Bridge
0.25 daysThu 5/27/04Thu 5/27/04Mech.Tech.[2]16,17,1119,21
19
Disconnect Platform MCWS
0.5 daysThu 5/27/04Fri 5/28/04Mech.Tech.1820
20
Disconnect Subsystems Utilities
1 dayFri 5/28/04Mon 5/31/04Mech.Tech.1926
21
Remove Platform Bridge
0.25 daysThu 5/27/04Thu 5/27/04Mech.Tech.[2]1826,22
22
Remove South Platform Stairs
0.25 daysThu 5/27/04Fri 5/28/04Mech.Tech.[2]2126,24
23
Disconnect RHIC Vacuum Pipe
0.5 daysThu 5/27/04Thu 5/27/04Mech.Tech.11 
24
Remove Seismic Anchors
0.25 daysFri 5/28/04Fri 5/28/04Mech.Tech.[2]2225
25
Disconnect Magnet LCW
0.25 daysFri 5/28/04Fri 5/28/04Mech.Tech.[2]2426
26
Roll Detector into AB
1 dayMon 5/31/04Tue 6/1/04Mech.Tech.[2]11,21,22,25,2027
27
Blow-out Magnet Coils
0.5 daysTue 6/1/04Tue 6/1/04Mech.Tech.[2]2628
28
Connect South Platform Stairs
0.5 daysTue 6/1/04Wed 6/2/04Mech.Tech.[2]2729
29
Connect Platform Bridge
0.5 daysWed 6/2/04Wed 6/2/04Mech.Tech.[2]2831,30
30
Connect Seismic Anchors
0.5 daysWed 6/2/04Thu 6/3/04Mech.Tech.29 
31
Install Buss Bridge
0.5 daysWed 6/2/04Thu 6/3/04Mech.Tech.[2]2932
32
Connect Electrical Power
0.5 daysThu 6/3/04Thu 6/3/04Electrician[2]3133SS
33
Connect Subsystems Utilities
0.5 daysThu 6/3/04Thu 6/3/04Mech.Tech.32SS34SS
34
Connect Platform MCWS
0.5 daysThu 6/3/04Thu 6/3/04Mech.Tech.33SS35
35
Detector In AB
0 daysThu 6/3/04Thu 6/3/04 3437,117,121
36
Remove East & West FTPC
13.75 daysThu 6/3/04Wed 6/23/04   
37
Remove E/W IFC Air Manifolds
0.25 daysThu 6/3/04Thu 6/3/04Mech.Tech.3538
38
Remove East & West Scaffold
0.5 daysThu 6/3/04Fri 6/4/04Carpenter[2]3739
39
Install West Platform & Rails
1 dayFri 6/4/04Mon 6/7/04Carpenter[2]3840,41
40
Remove West FTPC
0.5 daysMon 6/7/04Mon 6/7/04Mech.Tech.3945
41
Rig Installation Frame into AB
0.5 daysMon 6/7/04Mon 6/7/04Riggers[3]3942SS
42
Install East Installation Frame
0.5 daysMon 6/7/04Mon 6/7/04Mech.Tech.[2]41SS43
43
Install East Rails
1 dayMon 6/7/04Tue 6/8/04Mech.Tech.[2]4244
44
Remove East FTPC
0.5 daysTue 6/8/04Wed 6/9/04Mech.Tech.[2]4345
45
East & West FTPC's Removed
0 daysWed 6/9/04Wed 6/9/04 40,4446,48
46
Maintenance on FTPC's
10 daysWed 6/9/04Wed 6/23/04Electronic Tech45 
47
Remove Cone
11.5 daysWed 6/9/04Thu 6/24/04   
48
Disconnect Utilities
4 daysWed 6/9/04Tue 6/15/04Mech.Tech.4549
49
Remove Cone from IFC
0.5 daysTue 6/15/04Tue 6/15/04Mech.Tech.4876,126
50
Remove East Installation Frame
1 dayTue 6/22/04Wed 6/23/04Mech.Tech.[2]76,12651FF
51
Remove Installation Frame from AB
0.5 daysWed 6/23/04Wed 6/23/04Riggers[3]50FF52
52
Remove Installation Frame West
1 dayWed 6/23/04Thu 6/24/04Carpenter[2]5153
53
Cone Removed
0 daysThu 6/24/04Thu 6/24/04 5257
54
Install East BEMC Modules
47.5 daysMon 6/14/04Wed 8/18/04   
55
(30) Modules Delivered
4 daysMon 6/14/04Fri 6/18/04Riggers[3]57FF-5 days56FF
56
(30) Modules Staged in AB
4 daysMon 6/14/04Fri 6/18/04Mech.Tech.[2]55FF 
57
Install East & West Scaffold
0.5 daysThu 6/24/04Fri 6/25/04Carpenter[2]5358,55FF-5 days
58
Remove East Side Cables & Tray
3 daysFri 6/25/04Wed 6/30/04Mech.Tech.[2]5759
59
Erect Installation Fixture S.E. Upper
0.5 daysWed 6/30/04Wed 6/30/04Mech.Tech.[2]5860
60
Remove S.E. TPC Support Arm
0.25 daysWed 6/30/04Thu 7/1/04Mech.Tech.[2]5961
61
Install Modules 106-103
4 daysThu 7/1/04Wed 7/7/04Mech.Tech.[2]6062
62
Erect Installation Fixture S.E. Lower
0.5 daysWed 7/7/04Wed 7/7/04Mech.Tech.[2]6163
63
Install Modules 102-89
14 daysWed 7/7/04Tue 7/27/04Mech.Tech.[2]6264
64
Install S.E. TPC Support Arm
0.5 daysTue 7/27/04Wed 7/28/04Mech.Tech.[2]6365
65
Erect Installation Fixture N.E. Lower
0.5 daysWed 7/28/04Wed 7/28/04Mech.Tech.[2]6466
66
Install Modules 77-88
12 daysWed 7/28/04Fri 8/13/04Mech.Tech.[2]6567
67
Remove Installation Fixture
0.25 daysFri 8/13/04Fri 8/13/04Mech.Tech.[2]6668
68
Install East Side Cables & Tray
3 daysFri 8/13/04Wed 8/18/04Mech.Tech.[2]6769
69
East BEMC Installation Complete
0 daysWed 8/18/04Wed 8/18/04 6882,72
70
Install BEMC PMT Boxes
35 daysWed 7/14/04Wed 9/1/04   
71
Install 208 VAC Power
15 daysWed 7/14/04Wed 8/4/04Electrician[2]72SF-10 days 
72
Install PMT Boxes
10 daysWed 8/18/04Wed 9/1/04Mech.Tech.[2]6973FF,71SF-10 days
73
Install Electronics
20 daysWed 8/4/04Wed 9/1/04Electronic Tech72FF74
74
PMT Box Installation Complete
0 daysWed 9/1/04Wed 9/1/04 73144
75
Install SSD
20.5 daysTue 6/15/04Wed 7/14/04   
76
Rig Cone to Cleanroom Roof
0.5 daysTue 6/15/04Wed 6/16/04Mech.Tech.4977,50
77
Install SSD on Cone
20 daysWed 6/16/04Wed 7/14/04Mech.Tech.7678SS,80
78
Install LV Crate & Cables
5 daysWed 6/16/04Wed 6/23/04Electronic Tech77SS79
79
Install RDO Boxes
5 daysWed 6/23/04Wed 6/30/04Electronic Tech78 
80
SSD Installed on Cone
0 daysWed 7/14/04Wed 7/14/04 7785
81
Install Cone
20.5 daysWed 8/18/04Thu 9/16/04   
82
Rig Installation Frame into AB
0.5 daysWed 8/18/04Thu 8/19/04Riggers[3]6983SS
83
Install East Installation Frame
0.5 daysWed 8/18/04Thu 8/19/04Mech.Tech.[2]82SS84
84
Install Tables & Rails
0.5 daysThu 8/19/04Thu 8/19/04Mech.Tech.8385
85
Rig Cone to Rails
0.5 daysThu 8/19/04Fri 8/20/04Mech.Tech.[2]84,8086
86
Survey SSD to SVT
2 daysFri 8/20/04Tue 8/24/04Surveyors[2]8587
87
Complete SSD Installation
2 daysTue 8/24/04Thu 8/26/04Mech.Tech.8688
88
Test Utility Connections
1 dayThu 8/26/04Fri 8/27/04Electronic Tech8789FF
89
Clean TPC IFC
1 dayThu 8/26/04Fri 8/27/04Mech.Tech.88FF90
90
Install Cone in Detector
0.5 daysFri 8/27/04Fri 8/27/04Mech.Tech.8991
91
Test IFC High Voltage
0.5 daysFri 8/27/04Mon 8/30/04Electronic Tech9092
92
Survey TPC to Magnet
2 daysMon 8/30/04Wed 9/1/04Surveyors[2]9193
93
Survey SVT to TPC
2 daysWed 9/1/04Fri 9/3/04Surveyors[2]9294
94
Install East Partitions
0.5 daysFri 9/3/04Fri 9/3/04Mech.Tech.93110
95
Connect Water Lines
0.5 daysMon 9/6/04Tue 9/7/04Mech.Tech.11096
96
Connect RDO Cables
1 dayTue 9/7/04Wed 9/8/04Electronic Tech9597
97
Remove East Rails from IFC
0.5 daysWed 9/8/04Wed 9/8/04Mech.Tech.[2]9698
98
Remove East Installation Frame
0.5 daysWed 9/8/04Thu 9/9/04Mech.Tech.[2]9799FF
99
Remove Installation Frame from AB
0.25 daysThu 9/9/04Thu 9/9/04Riggers[3]98FF100
100
East Side Complete
0 daysThu 9/9/04Thu 9/9/04 99107,101
101
Install West Partitions
0.5 daysThu 9/9/04Thu 9/9/04Mech.Tech.100112
102
Connect Water Lines
0.5 daysMon 9/13/04Mon 9/13/04Mech.Tech.114103
103
Connect RDO Cables
1 dayMon 9/13/04Tue 9/14/04Electronic Tech102104
104
Remove West Rails from IFC
0.5 daysTue 9/14/04Wed 9/15/04Mech.Tech.103105
105
Remove Installation Frame West
1 dayWed 9/15/04Thu 9/16/04Carpenter[2]104106
106
West Side Complete
0 daysThu 9/16/04Thu 9/16/04 105107
107
Cone Installation Complete
0 daysThu 9/16/04Thu 9/16/04 100,106144
108
Install FTPC East & West in AB
12.5 daysWed 8/25/04Mon 9/13/04   
109
Run & Test N. Platform
5 daysWed 8/25/04Wed 9/1/04Electronic Tech110SF-2 days 
110
Install East FTPC in Detector
1 dayFri 9/3/04Mon 9/6/04Mech.Tech.[2]94115,109SF-2 days,95
111
Run & Test N. Platform
5 daysWed 9/1/04Wed 9/8/04Electronic Tech114SF-2 days 
112
Remove West Scaffold
0.25 daysThu 9/9/04Fri 9/10/04Carpenter[2]101113
113
Install West Platform & Rails
0.25 daysFri 9/10/04Fri 9/10/04Carpenter[2]112114
114
Install West FTPC in Detector
1 dayFri 9/10/04Mon 9/13/04Mech.Tech.[2]113115,111SF-2 days,102
115
FTPC Installed in AB
0 daysMon 9/13/04Mon 9/13/04 114,110 
116
PMD Maintenance
40 daysThu 6/3/04Thu 7/29/04   
117
Subsystem Maintenance
30 daysThu 6/3/04Thu 7/15/04 35118
118
Detector Commisioning
10 daysThu 7/15/04Thu 7/29/04 117119
119
PMD Maintenance Complete
0 daysThu 7/29/04Thu 7/29/04 118 
120
EEMC Maintenance
90 daysThu 6/3/04Thu 10/7/04   
121
Maintenance
50 daysThu 6/3/04Thu 8/12/04 35122SS
122
MAPMT Installation
80 daysThu 6/3/04Thu 9/23/04Mech.Tech.[2]121SS123
123
Subsystem Testing
10 daysThu 9/23/04Thu 10/7/04 122124
124
EEMC Maintenance Complete
0 daysThu 10/7/04Thu 10/7/04 123 
125
TPC Maintenance
50 daysTue 6/15/04Tue 8/24/04   
126
Repair IFC Strip Short
5 daysTue 6/15/04Tue 6/22/04Mech.Tech.49127,50,131SS
127
Modify Resistor Chain
5 daysTue 6/22/04Tue 6/29/04Mech.Tech.126128
128
FEE & RDO Maintenance
40 daysTue 6/29/04Tue 8/24/04Electronic Tech127129
129
TPC Maintenance Complete
0 daysTue 8/24/04Tue 8/24/04 128 
130
TOF Maintenance
15 daysTue 6/15/04Tue 7/6/04   
131
Tray Maintenance
10 daysTue 6/15/04Tue 6/29/04 126SS132
132
Detector Testing
5 daysTue 6/29/04Tue 7/6/04 131133
133
TOFp Maintenance Complete
0 daysTue 7/6/04Tue 7/6/04 132 
134
FPD Installation
20 daysThu 5/27/04Thu 6/24/04   
135
Install West Detectors
10 daysThu 5/27/04Thu 6/10/04Mech.Tech.11136
136
Install N. E. Stand for 20-cm Travel
5 daysThu 6/10/04Thu 6/17/04Mech.Tech.[2]135137
137
Detector Commisioning
5 daysThu 6/17/04Thu 6/24/04 136138
138
FPD Installation Complete
0 daysThu 6/24/04Thu 6/24/04 137140
139
BBC Maintenance
15 daysThu 6/24/04Thu 7/15/04   
140
Subsystem Maintenance
10 daysThu 6/24/04Thu 7/8/04 138141
141
Detector Commisioning
5 daysThu 7/8/04Thu 7/15/04 140142
142
BBC Maintenance Complete
0 daysThu 7/15/04Thu 7/15/04 141 
143
Move Detector into WAH
27 daysThu 9/16/04Mon 10/25/04   
144
Disconnect Electrical Power
0.5 daysThu 9/16/04Thu 9/16/04Electrician[2]107,74147,145SS,146SS
145
Disconnect Platform MCWS
0.5 daysThu 9/16/04Thu 9/16/04Mech.Tech.144SS 
146
Disconnect TPC Utilities
0.5 daysThu 9/16/04Thu 9/16/04Mech.Tech.144SS 
147
Remove Buss Bridge
0.5 daysThu 9/16/04Fri 9/17/04Mech.Tech.[2]144148
148
Remove Platform Bridge
0.5 daysFri 9/17/04Fri 9/17/04Mech.Tech.[2]147149
149
Remove South Platform Stairs
1 dayFri 9/17/04Mon 9/20/04Mech.Tech.[2]148150
150
Disconnect Seismic Anchors
0.5 daysMon 9/20/04Tue 9/21/04Mech.Tech.[2]149151SS
151
Lower Detector to Rails
0.5 daysMon 9/20/04Tue 9/21/04Mech.Tech.[2]150SS152
152
Roll Detector into WAH
1.5 daysTue 9/21/04Wed 9/22/04Mech.Tech.[2]151153,154
153
Connect Magnet LCW
1 dayWed 9/22/04Thu 9/23/04Mech.Tech.[2]152 
154
Raise/Level Detector @ IR
0.5 daysWed 9/22/04Thu 9/23/04Mech.Tech.[2]152155FF,163
155
Connect Seismic Anchors
0.5 daysWed 9/22/04Thu 9/23/04Mech.Tech.[2]154FF159,156
156
Install Buss Bridge
0.5 daysThu 9/23/04Thu 9/23/04Mech.Tech.[2]155157,160
157
Connect Electrical Power
1 dayThu 9/23/04Fri 9/24/04Electrician[2]156158
158
Connect Magnet Power
1 dayFri 9/24/04Mon 9/27/04Elect.Tech.[2]157 
159
Connect All Subsystem Utilities
2 daysThu 9/23/04Mon 9/27/04Mech.Tech.[2]155168,166
160
Connect Platform MCWS
0.5 daysThu 9/23/04Fri 9/24/04Mech.Tech.156168,161
161
Connect South Platform Stairs
1 dayFri 9/24/04Mon 9/27/04Mech.Tech.[2]160162
162
Connect Platform Bridge
0.5 daysMon 9/27/04Mon 9/27/04Mech.Tech.[2]161167
163
Connect Vacuum Pipe & Supports
0.5 daysThu 9/23/04Thu 9/23/04Mech.Tech.[2]154164
164
Vacuum Pipe Bake-out
5 daysThu 9/23/04Thu 9/30/04Mech.Tech.[2]163165
165
Survey Beam Pipe & Magnet
4 daysThu 9/30/04Wed 10/6/04Surveyors[2]164 
166
Detector Safety Certification
2 daysMon 9/27/04Wed 9/29/04 159 
167
Install Shield Wall
3 daysMon 9/27/04Thu 9/30/04Riggers[3]162171
168
Subsystems testing in WAH
20 daysMon 9/27/04Mon 10/25/04 160,159169SS+5 days
169
Install Pole Tips
2 daysMon 10/4/04Wed 10/6/04Mech.Tech.[2]168SS+5 days170
170
Install BBC Detectors
1 dayWed 10/6/04Thu 10/7/04Mech.Tech.[2]169171
171
Shutdown Activities Complete
0 daysThu 10/7/04Thu 10/7/04 167,170 

Ralph test area

Under:

This is my first test page.

XML Geometry demonstration

Speaker : Maxim Potekhin ( BNL )


Talk time : 12:50, Duration : 00:10

Library readiness for SVT+SSD+Vertex

Speaker : Lidia Didenko ( BNL )


Talk time : 12:40, Duration : 00:10

B-EMC calibration status and revised agenda

Speaker : Adam Kocoloski ( MIT )


Talk time : 12:20, Duration : 00:10
At the S&C meeting three weeks ago I identified three tasks that would have to be addressed before BEMC is ready for production. Here's an update:

  1. SMD/PSD pedestals (Priscilla Kurnadi, UCLA) Propose to set pedestal = 0 for problematic channels so we can go back and analyze these in greater detail with muDsts. Should be < 10% of channels. Priscilla has analyzed the stability of pedestals; final determination of number of tables to upload still needs to be made. Estimate to production-ready: 3 weeks.
  2. BTOW status (Dave Staszak, UCLA) Dave S. is using Dave Relyea's code to produce status tables using fastOffline muDst's. He has been on this project for ~2 weeks and we expect to show first status table and pedestal calculations for a single run at next EMC phone. Estimate to production-ready: 4 weeks. Will need more time than that to finish status tables, but I think we can produce a set that accounts for the majority of problems in that time frame
  3. BTOW peds The online pedestals should not be used. Several channels have unphysical widths. Options for replacing these peds include: a) Jan's L2 peds, b) pedestals returned from the status tables, or c) separate analysis. So, estimate: <= 4 weeks, shorter if L2 pedestals are deemed adequate.

E-EMC status and timeline for readiness for Y6 p+p

Speaker : Jan Balewski (TBC) ( IUCF )


Talk time : 12:30, Duration : 00:10

This talk was not confirmed.

The Effects of the Inclusion of SVT Hits in the Reconstruction of K0Shorts

QA on the new productions of CuCu @ 200 GeV

Speaker : Christine Nattrass ( Yale )


Talk time : 12:00, Duration : 00:10
Follow link Azimuthal distribution of particles

StEmcTriggerMaker

Under:
Documentation provided by Renee Fatemi

MOTIVATION:

First Iteration

Under:
March 27, 2007

Software

Under:
The main EMC offline reconstruction chain consists of:  

pp2006: transverse polarization

Under:
Just as was done in the pp2006: longitudinal polarization, I calibrated using the technique described SpaceCharge and GridLeak Calibration How-To Guide. Just a couple notes:
  • I did not even attempt to look at the no-calibration data as the pp2006: longitudinal polarization showed this to be of little help. I simply assumed that ZDC east+west would again be the best relevant scaler.
  • Again, calibration was done without the beamline constraint with one exception. For the last pass, I used the values predicted by all the previous passes along with the beamline constraint. The result was a new data point which sits almost exactly on the fit curves, not changing the fits, which is good evidence that the fit had indeed converged.
  • The fits for the offset parameter were not as good as the other fits, but almost certainly good enough to move forward.
  • Spread in the measures of the SpaceCharge ionization did not improve in any significant way with the use of the beamline calibration. This implies that either the beamline calibration is not doing anything useful, or the spread in the sDCA distribution is dominated by something else.

Here are the plots and output from my final iterative pass:

* Constraint on SC x GL = 7.32e-07
* Guesses on SC = 8.73e-08 , 4.39e-08 , 8.63e-08 , 4.39e-08
* Guesses on GL = 8.39 , 11.3 , 8.48 , 11.3
* Guesses on SO = 3.27e+04 , 3.26e+04

*** FINAL CALIBRATION VALUES: ***
SC = 8.63e-08 * ((zdce+zdcw) - (3.27e+04)) with GL = 8.48

Gene Van Buren

Database load balancer, status and next step

Speaker : Mike DePhillips ( BNL )


Talk time : 13:00, Duration : 00:10

AOB

Speaker : All ( All )


Talk time : 12:50, Duration : 00:10

Xrootd status and recent developments

Speaker : Pavel Jakl ( NPI-AS )


Talk time : 12:30, Duration : 00:10

Additional link to plots:

http://www.star.bnl.gov/~pjakl/xrootdStat/index.html

Simulation, new SVT review request

Speaker : Maxim Potekhin ( BNL )


Talk time : 12:20, Duration : 00:10

Cu+Cu 200 GeV possible issues

Speaker : Yuri Fisyak ( BNL )


Talk time : 12:10, Duration : 00:10

Year6 p+p (TPC) calibration status

Speaker : Gene Van Buren ( BNL )


Talk time : 12:00, Duration : 00:10

BeamLine Constraint

  • Data from days 73-130 processed (includes first longitudinal polarization period,
    and transverse polarization period, but not second longitudinal period).

  • Studied and verified validity of triggers I used.
  • Identified some problem fills, like:
    1. Fill 7697 (day 93): removing some of the data makes point drop back down; will use
      calib from previous fill

    2. Fill 7712 (day 97): that's all the statistics we have; will use
      calib from next fill

    3. Fill 7786 (day 117): two independent subsets of the data show similar calibs;
      will use the calib found for that fill
  • Discussed volatility during transverse running with a RHIC operator,
    seems not unexpected.

  • Processing of other May longitudinal data progress.

SpaceCharge & GridLeak

  • Calibrations using the May longitudinal polarization dataset is done (without using
    BeamLine Constraint) and is in the DB.
    More details are available pp2006: longitudinal polarization.

  • Distortion is so large without any calibration that tracking is being affected
    (tracks are being split at the gap between inner and outer TPC sectors).

  • Performed checks that BeamLine Constraint does not affect SpaceCharge calibrations,
    and that SpaceCharge does not affect BeamLine calibration.

  • Very close to finishing transverse polarization calibration (one more iteration).
  • Will need to re-calibrate with different beam polarizations/energies

Short in TPC IFC East

  • As You do not have access to view this node, there is a distortion due to an
    electrical short in the TPC IFC East

  • Excess current continues to rise and has exceeded the amount which can be
    explained by bridging a 2 MOhm resistance gap, which most probably isolates it
    to one of the patched 3 MOhm resistance gaps.

  • Jim Thomas and I have discussed how to handle this varying distortion and
    will work on implementing it in the coming weeks.

  • Distortion is not large enough to prevent moving forward with a dEdx calibration.

Gene Van Buren

gene@bnl.gov

Review charges reminder, logistic

Speaker : Myself ( BNL )


Talk time : 17:00, Duration : 00:10
On 5/27/2006 14:50, Timothy Hallman wrote:
Dear STAR Collaborators,

The email concerns an upcoming planning exercise related to
STAR's inner tracking detectors. The review, which will take place
just before the Collaboration meeting (July 7-8) at BNL, will place
particular emphasis on understanding how a plan which optimizes our
physics program in the next few years (including planned upgrades
of STAR's capability) informs the question of future utilization of
the SVT and when it should be taken out of the STAR set-up.

The draft charge for the SVT Review Committee is attached below.
The agenda and the membership of the review panel will be announced
in the coming week.

As a final comment, I would like to thank, in advance, Jerome Lauret,
and Spiros Margetis for organizing the necessary effort for this review, as
well as all the members of the STAR software and SVT analysis teams who
have been working steadily behind the scenes for close to a year now to
produce the necessary understanding to inform this important
discussion.



                               Sincerely,

                               Tim Hallman
Charge to the SVT Review Panel: The charge to the committee is to comment on how a plan which optimizes the scientific output of the STAR Collaboration in the next 3-5 years influences the issue of whether and when the STAR Silicon Vertex Tracker should be removed.

The core physics goals of the STAR Collaboration in the next 3-5 years include:

Planned analysis and who is going to make presentations

Speaker : All ( All )


Talk time : 17:20, Duration : 00:30
It is rather important to both know where people are, if there are problems seen, have a general status and make an assessment of what we can __really__ do/present and the intent from people to do what analysis. Concrete is needed with for objective to draw an agenda.

Comments / questions: