Data set status and location summary

Speaker : Lidia Didenko ( BNL )


Talk time : 17:10, Duration : 00:10

SVT/SSD Review Coordination meeting 7

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
Previous meetings are available at
  1. [node:1297]
  2. [node:1540]
  3. [node:1568]
  4. [node:2299]
  5. [node:2298]
  6. [node:2300]
Attendance: Jamie, Lidia, Gene, Maxim, Rene, Christina, Yuri, Victor and Thomas
Phone: Spiros



TimeTalkPresenter
17:00Review charges reminder, logistic ( 00:10 ) 0 filesMyself (BNL)
17:10Data set status and location summary ( 00:10 ) 0 filesLidia Didenko (BNL)
17:20Planned analysis and who is going to make presentations ( 00:30 ) 0 filesAll (All)

Job tracker progress

Speaker : Valeri Fine ( BNL )


Talk time : 15:30, Duration : 00:10

AOB

Speaker : All ( All )


Talk time : 15:40, Duration : 00:10

Site status

Speaker : All ( All )


Talk time : 15:20, Duration : 00:10
  • PDSF
  • BNL
  • WSU
  • SPU

Follow-ups

Speaker : All ( All )


Talk time : 15:00, Duration : 00:20
  • PDSF "module load" issue
    Discussion on using STAR more specific site_pre_setup.csh and site_post_setup.csh from GROUP_DIR/
  • SRM issues - FZD file transfer failed
    • Did we tested this at WSU
    • Did globus-url-copy worked??
  • BNL add-on to GUMS (Wayne)

Pedestals / Status Tables

Under:

Code for the calculation of the BTOW & BSMD status tables has been made publicly accessible. BTOW status code is in StRoot/StEmcPool/CSMStatusUtils.

Calibrations

Under:

Here you'll find links to calibration studies for the BEMC:

BTOW

2006

SH decomposition in proton-antiproton

Speaker : Hania Gos ( Warsaw University Of Technology, SUBATECH )


Talk time : 15:40, Duration : 00:10

The studies of asymmetry in proton-antiproton correlations

Speaker : Hania Gos ( Warsaw University Of Technology, SUBATECH )


Talk time : 15:30, Duration : 00:10

200412

Topics were
  • Review of run preparation issues and action items
  • Electronic ShiftLog improvements
  • ITTF issue: Action plan to converge fast and efficiently
  • ITTF opened issues seen by all, opinion gathering

200509

Topics were
  • Vacation days issue (overdues and penalties when not declared)
  • Hiring and budget situation
  • Purchase justifications
  • Safety issues at BNL
  • Cyber-security
  • Quality of our data, general QA issues

200510

Agenda was:
  • Feedback on new appraisal Web-based system
  • CHEP06 preparation and who wants to go (or should go)
  • Gene's overview of the TIME05 conference
  • ITD service evaluation survey

200604

Topics were:
  • Team effort reminder - BugTracking use and need to follow up
  • Software and computing papers / publications issues
  • Praveeen farewell party, what does it mean
  • Reactions as per our iterim director

200605

Topic discussed:
  • Summary of past meeting action item status
  • Result from last polls
  • Discussion on paper publication policies
  • UEC voting. Overview and scope.
  • Engaging in outside activity. BNL regulation.

How do you find the frequency of the internal group meeting ?

Adequate
100% (9 votes)
Less often would be best
0% (0 votes)
More often would be good
0% (0 votes)
Total votes: 9

Do you find the S&C internal group meeting useful ?

Yes
57% (4 votes)
No
0% (0 votes)
Somewhat
43% (3 votes)
Total votes: 7

S&C internal group meetings

pp2006: longitudinal polarization

Under:
Using the calibration technique described SpaceCharge and GridLeak Calibration How-To Guide, I made several passes on data from the longitudinal polarization running. This was the first dataset from the 2006 running which I calibrated, and there were a few items to note during this calibration process:
  • No beamline constraint was yet available while I did the calibration. Instead, a beamline fixed to the z-axis was used. This should bias the vertex positions, but as long as tracks used in this calibration come from all azimuth angles, there should only be a smearing of the DCA distributions, not a bias.
  • Distortions were larger than ever before, so histogram ranges needed expanding.
  • Spread in the measures of the GridLeakage and SpaceCharge ionization were larger than I found when calibrating CuCu22 from last year, so I had to open the cuts used in the Calib_SC_GL.C macro (from 0.005 and 0.0003 respectively for CuCU22, to 0.015 and 0.0015 for this data). The SpaceCharge cut in particular had to be significantly widened. I though that this might be because of the uncalibrated beamline constraint, which introduces a smearing of a few mm into the primary vertex DCA distribution used to determine SpaceCharge, but a later test using the beamline constraint did not significantly narrow this distribution.
  • For the first pass of this calibration, I used Fast Offline data which had no SpaceCharge and GridLeak corrections. While the first pass was somewhat useful to suggest where to start with SpaceCharge and GridLeak correction parameters, I had to remove the first pass data points from the eventual iterative pass fits because the distortion is so strong that without correction we actually lose tracks with large GridLeak gaps, biasing our measure of the distortion. This can be seen in the following plot of measured distortion gap versus the amount of GridLeak correction used (as expressed by SC*GL), where the no-correction points significantly alter the straight-line fit:

    It may also be true that the StMagUtilities code used to correlate distortions to the ionization has issues when the GridLeak gap is large. Work is in progress to improve this particular code.


Excluding the no-correction data, here are the plots and output from my final iterative pass (after enough iterations to stabilize the fits):

* Constraint on SC x GL = 7.31e-07
* Guesses on SC = 8.9e-08 , 3.95e-08 , 8.96e-08 , 3.95e-08
* Guesses on SO = 4.68e+04 , 4.72e+04

*** FINAL CALIBRATION VALUES: ***
SC = 8.96e-08 * ((zdce+zdcw) - (4.7e+04)) with GL = 8.2

Gene Van Buren

Useful Documents

Under:

 A full list of attached documents is available below, but I wanted to highlight a few here:

BEMC Technical Design Report (PDF)