Stony Brook analysis
Updated on Sat, 2019-12-21 13:12 by huyu. Originally created by yezhenyu on 2019-12-16 23:34.Speaker : Niseem Magdy
Talk time : 14:50, Duration : 00:20
Introduction: Status and path forward
Updated on Fri, 2019-12-20 10:51 by dunlop. Originally created by yezhenyu on 2019-12-16 23:33.Speaker : James Dunlop
Talk time : 14:30, Duration : 00:20
analysis of eTOF data before / after HV change
Updated on Mon, 2019-12-16 21:00. Originally created by fseck on 2019-12-16 20:58.Attached are the matching ratio plots for several runs before the HV change combined ( mostly day345) and after the HV change (mostly day 347).
EPD cable weight between Rx boards and QT boards
Updated on Mon, 2019-12-16 14:15. Originally created by adams92 on 2019-12-16 13:33. The take away: regularly check the cable tension between Rx boards and QT boards!
EPD channel measuring cosmics out of Rx board, but blue in QA plots and not showing any MIP peaks
Updated on Mon, 2019-12-16 14:54. Originally created by adams92 on 2019-12-16 13:27. At the beginning of Run 20 (December 2019), we noticed that a single EPD tile (West PP3 TT24) was showing no signs of life.
Holes in EPD QA plots
Updated on Mon, 2020-01-13 15:57. Originally created by adams92 on 2019-12-16 13:17. In run 19, we were seeing that, over the course of a few hours, the <ADC> displayed in the QA plots for some of the tiles would slowly become blue.
Y joints breaking
Updated on Tue, 2019-12-17 16:48. Originally created by adams92 on 2019-12-16 13:15. This page is very brief. There are Y-shaped joints in the fiber bundles, where the bundle splits in two.
Overview of Recent Heavy-Flavor and Jet Results from the STAR Experiment
Updated on Mon, 2019-12-16 10:08. Originally created by jentsch on 2019-12-16 10:08.
Mechanical Structure
Updated on Mon, 2019-12-16 15:28 by yiyang. Originally created by yezhenyu on 2019-12-16 09:38.Speaker : Yi Yang
Talk time : 15:30, Duration : 00:20
STAR Forward Silicon Tracker Meeting
Updated on Mon, 2019-12-16 09:37. Originally created by yezhenyu on 2019-12-16 09:37. 2019-12-16 15:30
2019-12-16 16:30
America/New York
Monday, 16 December 2019
https://bluejeans.com/101020434 , at 20:30 (GMT), duration : 01:00
https://bluejeans.com/101020434 , at 20:30 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
15:30 | Mechanical Structure ( 00:20 ) 0 files | Yi Yang |
Net-p C6 at Run18 27GeV
Updated on Tue, 2019-12-17 04:27. Originally created by tnonaka on 2019-12-16 01:06.
Run15 pp200 Embedding -- 2019-12-16
Updated on Fri, 2019-12-13 21:36. Originally created by tinglin on 2019-12-13 21:34.
v2 from different groups
Updated on Fri, 2019-12-13 19:03. Originally created by niseem on 2019-12-13 19:03.How to do bias voltage scans for the EPD
Updated on Sat, 2023-02-11 10:07. Originally created by adams92 on 2019-12-13 11:50. I have tried to make this as clear as possible; if there are errors or confusing points, please let me know!
Special multi-particle embedding for Run18 Au+Au 27GeV
Updated on Fri, 2020-05-15 05:34 by zhux. Originally created by sesumi on 2019-12-13 11:00.eTOF data run 20345015 - 20335016
Updated on Fri, 2019-12-13 09:27. Originally created by fseck on 2019-12-13 09:27.Comment for CEP paper
Updated on Thu, 2019-12-12 23:07. Originally created by wangmei on 2019-12-12 23:07.AOB / Round Table
Updated on Thu, 2019-12-12 15:53. Originally created by jwebb on 2019-12-12 14:59.Reference
Talk time : 17:00, Duration : 00:20