Mechanical Structure
Updated on Thu, 2019-12-12 09:16 by yiyang. Originally created by yezhenyu on 2019-12-11 09:32.Speaker : Yi Yang, Han-sheng Li
Talk time : 09:50, Duration : 00:20
Simulation
Updated on Wed, 2019-12-11 09:33. Originally created by yezhenyu on 2019-12-11 09:32.Speaker : Te-Chuan Huang/Flemming Videbaek, Krishan Gopal
Talk time : 10:10, Duration : 00:20
STAR Forward Silicon Tracker Meeting
Updated on Wed, 2019-12-11 09:32. Originally created by yezhenyu on 2019-12-11 09:32.https://bluejeans.com/101020434 , at 14:30 (GMT), duration : 01:30
Time | Talk | Presenter |
---|---|---|
09:30 | T-board, and Inner Signal Cable ( 00:20 ) 0 files | Jianing Dong, Mike Capotosto, Gerard Visser |
09:50 | Mechanical Structure ( 00:20 ) 1 file | Yi Yang, Han-sheng Li |
10:10 | Simulation ( 00:20 ) 0 files | Te-Chuan Huang/Flemming Videbaek, Krishan Gopal |
eTOF data run 20344007 - 20334021
Updated on Tue, 2019-12-10 20:52. Originally created by fseck on 2019-12-10 20:40.Runs 20334007, 008 and 013-021 combined give roughly 1.2M events with ETOF included.
Attached below are a few plots after basic position and T0 calibration and some thoughts:
Centrality and transverse momentum dependence of anisotropic flow of identified hadrons in Au+Au collisions at 200 GeV
Updated on Tue, 2019-12-10 20:21. Originally created by niseem on 2019-12-10 20:21.TPC Meeting
Updated on Wed, 2019-12-11 15:56. Originally created by iraklic on 2019-12-10 16:37.1-189, at 20:00 (GMT), duration : 01:00
Meeting Location - BNL Room 1-189
The Bluejean connection
Title: STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR
Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))
Meeting ID: 276 827 050
Direct link: https://bnl.bluejeans.com/276827050
Run 20 BTOW timing
Updated on Tue, 2019-12-10 19:57. Originally created by wwjacobs on 2019-12-10 15:25.From files Tonko supplied for run #20344042
Integral v2 study
Updated on Tue, 2019-12-10 22:00. Originally created by slhuang on 2019-12-10 14:11.
December 2019 - EPD East and West timing is now different
Updated on Tue, 2019-12-10 16:36. Originally created by lisa on 2019-12-10 14:08.Go to Executive summary
Go to Evidence and discussion
Run15 pp200 Embedding -- 2019-12-10
Updated on Fri, 2019-12-13 11:12. Originally created by tinglin on 2019-12-10 12:16.
HF PWG paper plans - 2019/12/12
Updated on Tue, 2019-12-10 18:11. Originally created by petrchal on 2019-12-10 05:43.
191210-Output files for T-board (v3.0)
Updated on Tue, 2019-12-10 20:29. Originally created by jndong on 2019-12-09 23:53.Keep ONE set of temperature sensor and reset circuit
Geometry
Updated on Mon, 2019-12-09 16:47. Originally created by jwebb on 2019-12-09 16:47.Vped scans (Dec. 2019)
Updated on Mon, 2019-12-09 16:37. Originally created by adams92 on 2019-12-09 16:37.Following Rosi's instructions (https://drupal.star.bnl.gov/STAR/blog/rjreed/epd-vped-scans-2019) and using run 20343004-8, and not running with the CAMAC crate off, I generated the attached PDFs
Diffractive pi^0 A_N with FMS and EEMC
Updated on Mon, 2019-12-09 14:54. Originally created by kabir on 2019-12-09 14:54.T-Board V3.0 Prototype Cable Assembly
Updated on Mon, 2019-12-09 11:21. Originally created by capotosto on 2019-12-09 11:21.
Pre-post checking using cosmics and BBC (Dec. 2019)
Updated on Mon, 2019-12-09 09:57. Originally created by adams92 on 2019-12-09 09:57.Following the instructions by Rosi (https://drupal.star.bnl.gov/STAR/blog/rjreed/checking-epd-prepost-cosm
Work plan for installing the EPD
Updated on Mon, 2019-12-09 09:34. Originally created by lisa on 2019-12-09 09:34.Each year, when the EPD team will mount the device, Rahul would like a workplan. It is more or less the same each year. Here is an image, and at the bottom are some files that you can modi
EPD Commissioning - Step-by-step
Updated on Wed, 2020-07-08 22:21. Originally created by lisa on 2019-12-09 09:16.Useful links: