- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- 2007 run, hardware changes
- 2008 run preparation
- Calibrations
- EEMC Detector Operator Manual
- EEMC Maintenance/Operations Documents
- Endcap Geometry
- Endcap Geometry update (2009)
- Log of tower base and fee issues
- eemc as-built info and proto tests
- emc2-hn minutes (by Jan)
- how-to by Jan
- slow controls archive viewer
- trash
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
timing_WMZ
Updated on Wed, 2007-12-12 09:43. Originally created by wzhang on 2007-12-11 10:15.
Under:
Fig. 1 Tower Crate
Fig. 2 Crate 64-67
Fig. 3 Crate 68-71
Fig. 4 Crate 72_75
Fig. 5 Crate 76-79
Fig. 6 Crate 80_83
Fig. 7 Crate 84-87
Fig. 8 Crate 88-91
Fig. 9 Crate 92-95
Fig. 10 Crate 96-99
Fig. 11 Crate 100-103
Fig. 12 Crate 104-107
Fig. 13 Crate 108-111
Plots of channels
mapmt-crate-64.pdf
»
- Printer-friendly version
- Login or register to post comments