Event Plane Detector

Under:

 

Event Plane Detector group:

  • Daniel Cebra (Davis)
  • Xin Dong (LBNL)
  • Geary Eppley (Rice)
  • Frank Geurts (Rice)
  • Mike Lisa (OSU)
  • Bill Llope (WSU)
  • Grazyna Odyniec (LBNL)
  • Robert Pak (BNL)
  • Alex Schmah (LBNL)
  • Prashanth Shanmuganathan (Kent)
  • Subhash Singha (Kent)
  • Mikhail Stepanov (Purdue)
  • Xu Sun (LBNL)
  • Aihong Tang (BNL)
  • Jim Thomas (LBNL)
  • Isaac Upsal (OSU)
  • Fuqiang Wang (Purdue)
  • Wei Xie (Purdue)
  • Rosi Reed (Lehigh)

Available R&D funds: 30k

R&D proposal: http://www.star.bnl.gov/protected/heavy/aschmah/EPD/STAR_R_and_D_proposal_EPD.pdf

Task Responsible
person
Timeline Resources
needed
GEANT4 simulation

  • Detector response function (input of different particles,
  • energies, angles, scintillator materials, scintillator
  • geometries, etc.)
  • Do we need wave length shifting fibres?
  • Light guides.
Issac Upsal (OSU), Alex Schmah (LBNL) 08/14 - 09/14 none
Tile geometry optimization

  • Minimizing the amount of different tiles.
  • Event plane resolution for new geometry.
  • Centrality resolution for new geometry.
Subhash Singha (Kent)
Mikhail Stepanov (Purdue)
09/14 - 10/14 none
Radiation tests of SiPMs

  • Estimation of expected radiation for BES II.
  • Comparison to BNL radiation tests (Akio).
  • Setup of radiation test for prototope detector.
Daniel cebra (UCD)    
Specifications of scintillators

  • Compare scintillator specs. 
  • Survey of possible vendors.
     
Specifications of SiPMs

  • Compare SiPM specs.
  • Survey of possible vendors.
  • Survey of what other experiments have used.
     
Setup of readout system

  • Simple readout system for basic tests.
  • Advanced readout system for prototype.
  • QT boards, PXL readout,...
     
Setup of basic test system

  • Cosmic tests.
  • Test of readout system.
  • Comparison to GEANT4 simulation.
 Mikhail Stepanov (Purdue)    
Development of wrapping technique

  • Optimized for  about 2000 tiles.
     
Development of techniques to install wave length shifting fibres

  • + connection to light guides and/or SiPMs
     
Mechanical construction for prototype

  • Two sector prototype.
     
Integration into STAR trigger system

  • Survey of requirements.
  • Contact STAR trigger group.
     
Trigger requirements (simulation/calculation)

  • For fixed target collisions.
  • Background suppression.
Daniel Cebra (UCD)    

Observable/Trigger Detector specification
v1  
v2  
v3  
HBT  
Fixed target  
Centrality