- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Operations 2025
- Operations 2025
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Operations 2025
Updated on Mon, 2025-06-09 17:05. Originally created by lisa on 2025-06-09 16:39.
Under:
Visual map of the electronics mapping - includes instructions for the shift crew
Pre-beam commissioning
With-beam commissioning
Issues for this run
Visual map of the electronics mapping - includes instructions for the shift crew
Pre-beam commissioning
- Installation and light-tight test of EPD
- Seven Patterns test
- Vped scan
With-beam commissioning
- Gate timing scan - done by Maria and Mike 9 June 2025 - blog by Mike
- Bias scan - done by Maria and Mike 9 June 2025
- TAC offset adjustment
Issues for this run
»