- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Operations 2025
- Operations 2025
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Operations 2025
Updated on Sun, 2025-06-15 15:53. Originally created by lisa on 2025-06-10 01:36.
Under:
Visual map of EPD mapping - includes instructions for shift crew
Pre-beam commissioning
Visual map of EPD mapping - includes instructions for shift crew
Pre-beam commissioning
- Installation and light-tight
- Seven Patterns test - blog by Maria
- Vped scan - blog by Maria
- Gate Timing Scan -
done by Maria and Mike 9 June 2025- note: bad beam ruined the scan. On 15 June we went back to 2024 values and things look good. - blog by Mike - Bias Scan - done by Maria and Mike 9-10 June 2025 - blog by Mike
- TAC offset adjustment - this was done 15 June using the 2024 trigger label values and briefly discussed in the - blog by Mike
- bad tiles or electronics channels - child page
»
- Printer-friendly version
- Login or register to post comments