- BEMC
- BEMC Detector Operator Manual
- Calibrations
- BPRS
- Run 8 BPRS Calibration
- 01 DB peds R9069005, 9067013
- 02 pedestal(capID)
- 03 tagging desynchronized capID
- 04 BPRS sees beam background?
- 05 ---- peds(softID,capID) & status table, ver=2.2, R9067013
- 06 MIP algo ver 1.1
- 07 BPRS peds vs. time
- 08 BPRS ped calculation using average
- 09 BPRS swaps, IGNORING Rory's finding from 2007, take 1
- 10 -------- BPRS swaps take2, _AFTER_ applying Rory's swaps
- 11 BPRS absolute gains from MIP, ver1.0 ( example of towers)
- 12 MIP gains ver1.0 (all tiles, also BTOW)
- 13 MIP algo, ver=1.1 (example of towers)
- 14 ---- MIP gains ver=1.6 , 90% of 4800 tiles ----
- 15 Broken BPRS channels ver=1.6, based on data from March of 2008
- 16 correlation of MIP ADC vs. raw slopes
- Run 9 BPRS Calibration
- Run 8 BPRS Calibration
- BSMD
- BTOW - Calibration Procedure
- Run 12 BTOW Calibration
- Run 3 BTOW Calibration
- Run 4 BTOW Calibration
- Run 5 BTOW Calibration
- Run 6 BTOW Calibration
- Run 7 BTOW Calibration
- Run 8 BTOW Calibration (2008)
- Run 9 BTOW Calibration
- BPRS
- Database
- Hardware
- Mapping
- Service Tasks
- Software
- Useful Documents
- EEMC
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HLT
- L3
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
11 BPRS absolute gains from MIP, ver1.0 ( example of towers)
Updated on Tue, 2009-03-10 14:43. Originally created by mattheww on 2008-11-17 09:31.
Under:
BPRS absolute gains from MIP, ver 1.0
Fig 1 Typical MIP signal seen by BPRS(left) & BTOW (right) for soft ID=??, BPM16.2.x (see attachment 1 for more)
Magenta line is at MIP MPV-1*sigma -> 15% false positives
Fig 2 Typical MIP signal seen by BPRS, pmt=BPM16.2
Average gain of this PMT is on the top left plot, MIP is seen in ADC=4.9, sig=2.6
Fig 3 Most desired MIP signal (ADC=16) seen by BPRS(left) & BTOW (right) for soft ID=1388, BPM12.1.8
Magenta line is at MIP MPV-1*sigma -> 15% false positives, (see attachment 2 for more)
Fig 4 Reasonable BPRS, pmt=BPM11.3, pixel to pixel gain variations is small
Fig 5 High MIP signal (ADC=28) seen by BPRS(left) & BTOW (right) , BPM11.5.14
Magenta line is at MIP MPV-1*sigma -> 15% false positives, (see attachment 3 for more)
Fig 6 High gain BPRS, pmt=BPM11.5
»
- Printer-friendly version
- Login or register to post comments