- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
e-scope traces
Updated on Tue, 2017-04-04 13:51. Originally created by sprastar on 2017-03-24 13:41.
Under:
E-Scope connections
03/24/2017
CH#1 => PP4_tile_1 (no-split, 50 ohm)
CH#3 => QT32b board 0x18 gate
Please see attaced image:PP_6_tile_1_nosplit.pdf, which shows a cosmic ray pules and QT gate.
04/03/2017
Following scope traces are acquired during beamin in RHIC.
THreshold = 8mV
CH#1 of scop to PP6 Tile 1 no split, 50 ohm termination)
CH#3 => QT32b board 0x10 gate
Please see
https://drupal.star.bnl.gov/STAR/system/files/scopetracesPP6T1_nosplit.pdf
04/04/2017
Following scope traces are acquired during beamin in RHIC.
THreshold = 4mV
CH#1 of scop to PP6 Tile 1 no split, 50 ohm termination)
CH#3 => QT32b board 0x10 gate
Please see https://drupal.star.bnl.gov/STAR/system/files/scopetracesPP6T1_nosplit_4mV.pdf
04/04/2017
Following scope traces are acquired during beamin in RHIC.
THreshold = 4mV && persistent
CH#1 of scop to PP6 Tile 1 no split, 50 ohm termination)
CH#3 => QT32b board 0x10 gate
Please see : https://drupal.star.bnl.gov/STAR/system/files/scopetracesPP6T1_nosplit_4mV_persistent.pdf
»
- Printer-friendly version
- Login or register to post comments